My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/21/2024 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/21/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 2:02:11 PM
Creation date
5/21/2024 2:01:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/21/2024
Council Approval Date
5/8/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />4 <br /> <br />included as part of the Basis of <br />Design Documents.” <br />2.3.1.4 <br /> <br />(see also <br />Task <br />7.2.a) <br />“A Project Schedule for the Phase 2 <br />Work based upon the Contract <br />Time(s) set forth in Article 6 hereof;” <br />Phase 2 Construction Schedule and Schedule <br />Narrative, contained in the Agreed Phase 2 <br />Proposal pdf. <br />2.3.1.5 <br />“If applicable, a list of Allowance <br />Items, Allowance Values, and a <br />statement of their basis;” <br /> <br />See Contract Section 2.3.1.1 – “COE – WFP Phase <br />2 Upgrades GMP Construction Cost Model <br />2.3.1.6 <br />“If applicable, a schedule of alternate <br />prices;” <br /> <br />Not applicable and not included in the Agreed <br />Phase 2 Proposal pdf. <br />2.3.1.7 “If applicable, a schedule of unit <br />prices;” <br />Not applicable and not included in the Agreed <br />Phase 2 Proposal pdf. <br />2.3.1.8 <br />“If applicable, a statement of <br />Additional Services which may be <br />performed but which are not <br />included in the Phase 2 Proposal, and <br />which, if performed, shall be the <br />basis for an increase in the GMP <br />and/or Contract Time(s);” <br />Not applicable and not included in the Agreed <br />Phase 2 Proposal pdf. <br />2.3.1.9 <br />“An expiration date for the Phase 2 <br />Proposal provided that Design- <br />Builder shall not make the Phase 2 <br />Proposal subject to expiration or <br />withdrawal for at least ninety (90) <br />days after submission and Owner <br />shall provide its initial review and <br />comment on the Phase 2 Proposal <br />within thirty (30) days of <br />submission;” <br />Unless this GMP Amendment is signed by both <br />parties prior to July 17, 2024, the Phase 2 <br />Proposal shall expire. <br />2.3.1.10 <br /> <br />(see also <br />Task <br />7.1.d) <br />“A Permits and Approvals list <br />detailing the permits and <br />governmental approvals not <br />otherwise addressed in the Contract <br />Documents that Owner and Design- <br />Builder will need and assigning <br />responsibility for each;” <br /> <br />Not applicable and not included in the Agreed <br />Phase 2 Proposal pdf. <br />2.3.1.11 “A preliminary training plan;” Not applicable and not included in the Agreed <br />Phase 2 Proposal pdf. <br />2.3.1.12 <br /> “A construction safety plan; and” Phase 2 Health and Safety Plan, contained in the <br />Agreed Phase 2 Proposal pdf.
The URL can be used to link to this page
Your browser does not support the video tag.