<br /> <br />4 <br /> <br />included as part of the Basis of <br />Design Documents.” <br />2.3.1.4 <br /> <br />(see also <br />Task <br />7.2.a) <br />“A Project Schedule for the Phase 2 <br />Work based upon the Contract <br />Time(s) set forth in Article 6 hereof;” <br />Phase 2 Construction Schedule and Schedule <br />Narrative, contained in the Agreed Phase 2 <br />Proposal pdf. <br />2.3.1.5 <br />“If applicable, a list of Allowance <br />Items, Allowance Values, and a <br />statement of their basis;” <br /> <br />See Contract Section 2.3.1.1 – “COE – WFP Phase <br />2 Upgrades GMP Construction Cost Model <br />2.3.1.6 <br />“If applicable, a schedule of alternate <br />prices;” <br /> <br />Not applicable and not included in the Agreed <br />Phase 2 Proposal pdf. <br />2.3.1.7 “If applicable, a schedule of unit <br />prices;” <br />Not applicable and not included in the Agreed <br />Phase 2 Proposal pdf. <br />2.3.1.8 <br />“If applicable, a statement of <br />Additional Services which may be <br />performed but which are not <br />included in the Phase 2 Proposal, and <br />which, if performed, shall be the <br />basis for an increase in the GMP <br />and/or Contract Time(s);” <br />Not applicable and not included in the Agreed <br />Phase 2 Proposal pdf. <br />2.3.1.9 <br />“An expiration date for the Phase 2 <br />Proposal provided that Design- <br />Builder shall not make the Phase 2 <br />Proposal subject to expiration or <br />withdrawal for at least ninety (90) <br />days after submission and Owner <br />shall provide its initial review and <br />comment on the Phase 2 Proposal <br />within thirty (30) days of <br />submission;” <br />Unless this GMP Amendment is signed by both <br />parties prior to July 17, 2024, the Phase 2 <br />Proposal shall expire. <br />2.3.1.10 <br /> <br />(see also <br />Task <br />7.1.d) <br />“A Permits and Approvals list <br />detailing the permits and <br />governmental approvals not <br />otherwise addressed in the Contract <br />Documents that Owner and Design- <br />Builder will need and assigning <br />responsibility for each;” <br /> <br />Not applicable and not included in the Agreed <br />Phase 2 Proposal pdf. <br />2.3.1.11 “A preliminary training plan;” Not applicable and not included in the Agreed <br />Phase 2 Proposal pdf. <br />2.3.1.12 <br /> “A construction safety plan; and” Phase 2 Health and Safety Plan, contained in the <br />Agreed Phase 2 Proposal pdf.