My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/21/2024 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/21/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 2:02:11 PM
Creation date
5/21/2024 2:01:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/21/2024
Council Approval Date
5/8/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />5 <br /> <br />(see also <br />Task <br />7.2.b) <br />2.3.1.13 <br /> <br />(see also <br />Task <br />7.2.c) <br />“A construction quality plan.” Phase 2 QC Plan with Appendices, contained in <br />the Agreed Phase 2 Proposal pdf. <br />Task <br />7.2.d <br />“Revised Self-Performance and <br />Subcontracting Plan, identifying work <br />packages planned to be self- <br />performed and subcontracted, <br />whether those packages are being <br />procured competitively or sole <br />sourced, description of approach to <br />procurement for competitive <br />packages, and identity of <br />subcontractor for sole sourced <br />packages.” <br />Self-Performance and Subcontracting Plan, <br />contained in the Agreed Phase 2 Proposal pdf. <br />Task <br />7.2.e <br />“Descriptive summary of all <br />engineering, procurement, materials, <br />construction labor and equipment, <br />and other services necessary to <br />perform the Phase 2 Work as <br />required under this PDB Contract.” <br />Not applicable and not included in the Agreed <br />Phase 2 Proposal pdf. <br />Task 7.2.f <br />“A Phase 2 scope of work for <br />engineering services during <br />construction, describing the work <br />tasks and activities to be provided by <br />the Engineer of Record and other <br />engineering or geotechnical firms <br />during Phase 2.” <br />KJ Construction Support Scope of Work (Engineer <br />of Record) and GeoEngineers Construction <br />Support Scope of Work (Geotechnical Firm), <br />contained in the Agreed Phase 2 Proposal pdf. <br />Task <br />7.2.g <br />“A Phase 2 staffing plan describing <br />the construction oversight activities <br />to be completed by the Design- <br />Builder, by the Engineer of Record, <br />by other engineering or geotechnical <br />firms, and by the City. The intent of <br />this document is to demonstrate a <br />shared understanding of oversight <br />roles and responsibilities during <br />construction, and to minimize <br />duplication of efforts.” <br />Phase 2 Staffing Plan, contained in the Agreed <br />Phase 2 Proposal pdf. <br />
The URL can be used to link to this page
Your browser does not support the video tag.