My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/21/2024 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/21/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 2:02:11 PM
Creation date
5/21/2024 2:01:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/21/2024
Council Approval Date
5/8/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
6 <br />Section B: Substantial Completion <br />Pursuant to Section 6.2.4 of the Contract, the required date of Substantial Completion for the Phase 2 <br />Services as established by this GMP Amendment is April 30, 2026. <br />Section C: Other Changes <br />C.1 Phase 1 Completion. The completion date for Phase 1 Services in Contract Section 6.1.1 is <br />amended from April 1, 2023 to May 31, 2024. <br />C.2 Phase 1 Price. The Phase 1 price in Contract Section 7.1 is amended as shown in the table below, <br />which is exclusive of Washington state sales tax. A breakdown of the Phase 1 amount added by this GMP <br />Amendment is attached to this GMP Amendment. <br />Original Phase 1 Price in Contract $2,723,318.68 <br />Amount added by this GMP Amendment $562,908.39 <br />New Phase 1 Price $3,286,227.07 <br />C.3 Key Personnel. The personnel table in Section 10.3 of the Contract is replaced with the following <br />table: <br />Position Title Name of Individual <br />Design-Builder Senior Representative / Project <br />Manager <br />CJ Handforth <br />Design-Builder Representative / Preconstruction <br />Manager <br />Todd Pike, DBIA <br />Design Manager Brad Florentin, PE <br />Structural Engineer PJ Bourdaniotis, PE, SE, DBIA <br />Civil Engineer Jon Honda, PE <br />Building Mechanical Engineer Ryan Ray, PE <br />Process Mechanical Engineer Jonathan Anderson, PE <br />Construction Project Manager Mitchell Sorestad <br />Construction Superintendent James Janda <br />Geotechnical Engineer Deb Overbay, PE <br />Hydrogeologist Steven Thomas, LHG <br />[signatures on following page]