6 <br />Section B: Substantial Completion <br />Pursuant to Section 6.2.4 of the Contract, the required date of Substantial Completion for the Phase 2 <br />Services as established by this GMP Amendment is April 30, 2026. <br />Section C: Other Changes <br />C.1 Phase 1 Completion. The completion date for Phase 1 Services in Contract Section 6.1.1 is <br />amended from April 1, 2023 to May 31, 2024. <br />C.2 Phase 1 Price. The Phase 1 price in Contract Section 7.1 is amended as shown in the table below, <br />which is exclusive of Washington state sales tax. A breakdown of the Phase 1 amount added by this GMP <br />Amendment is attached to this GMP Amendment. <br />Original Phase 1 Price in Contract $2,723,318.68 <br />Amount added by this GMP Amendment $562,908.39 <br />New Phase 1 Price $3,286,227.07 <br />C.3 Key Personnel. The personnel table in Section 10.3 of the Contract is replaced with the following <br />table: <br />Position Title Name of Individual <br />Design-Builder Senior Representative / Project <br />Manager <br />CJ Handforth <br />Design-Builder Representative / Preconstruction <br />Manager <br />Todd Pike, DBIA <br />Design Manager Brad Florentin, PE <br />Structural Engineer PJ Bourdaniotis, PE, SE, DBIA <br />Civil Engineer Jon Honda, PE <br />Building Mechanical Engineer Ryan Ray, PE <br />Process Mechanical Engineer Jonathan Anderson, PE <br />Construction Project Manager Mitchell Sorestad <br />Construction Superintendent James Janda <br />Geotechnical Engineer Deb Overbay, PE <br />Hydrogeologist Steven Thomas, LHG <br />[signatures on following page]