My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reid Middleton 5/21/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Reid Middleton 5/21/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 2:05:19 PM
Creation date
5/21/2024 2:04:49 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reid Middleton
Approval Date
5/21/2024
Council Approval Date
5/8/2024
End Date
12/31/2025
Department
Parks
Department Project Manager
Brad Chenoweth
Subject / Project Title
Design, engineering, and construction administration servcies PUD Recreational Trail Easement
Tracking Number
0004361
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Mr. Brad Chenoweth <br />City of Everett Parks & Facilities <br />March 18, 2024 <br />File No. 242023.009 <br />Page 3 <br /> <br /> <br /> <br />• Additional construction site visits can be added as additional contract <br />amendment(s) if requested. <br /> <br />7. Exclusions <br /> <br />• Topographic or hydrographic survey <br />• Eelgrass and other habitat surveys, cultural resource surveys and other <br />environmental documentation <br />• In-water soil exploration or any other geotechnical explorations. These can be <br />provided as additional services. <br />• Underwater (dive) assessment or testing for existing anchors <br />• Permitting assistance and/or tracking (WDFW, City, etc.) <br />• Analysis of structural load-carrying capacities <br /> <br />C. PERIOD OF PERFORMANCE <br /> <br />Reid Middleton will begin services upon receipt of a signed agreement, will make every <br />reasonable effort to complete the services in a timely manner considering the needs of the <br />project, and will complete the project prior to July 19, 2024. <br /> <br />D. CLIENT’S RESPONSIBILITIES <br /> <br />City of Everett Parks & Facilities shall provide available pertinent data, site access, <br />documents, and other information to Reid Middleton as necessary to complete the services <br />outlined in Section B above. <br /> <br />E. COMPENSATION <br /> <br />1. For services described in Sections A and B, Reid Middleton shall be paid on an hourly <br />basis as outlined in the Estimate of Professional Services. We estimate the fee for this <br />portion of the services to be Thirty-Three Thousand Seven Hundred Dollars ($33,700). <br /> <br />F. REID MIDDLETON STAFF <br /> <br />Blaine McRae will be the project manager primarily responsible for this job. However, other <br />individuals at Reid Middleton will work on aspects of your project as required. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.