My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/05/22 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/05/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 9:57:39 AM
Creation date
5/23/2024 8:34:55 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/22/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />700-003: Client Coordination and Reporting, during Construction <br />The Consultant will direct and supervise internal staff team members and their activities for the duration of <br />the construction project. The Consultant will monitor and track scope activities, budget expenditures, and <br />prepare monthly progress reports and invoices with sufficient detail to demonstrate expended effort and <br />budget status. <br /> <br />Task 700 Deliverables: <br />▪ Returned submittal reviews and RFI response/clarifications. <br />▪ Revised drawings, associated with any construction change proposals or change orders <br />▪ Field reports associated with site visits. <br />▪ Monthly Progress Reports and Invoices <br /> <br />Task 700 Assumptions: <br />▪ City shall be responsible for: <br />▫ Providing the Consultant with three sets (specifications and half-size plans), of “Approved for <br />Construction” documents. <br />▫ Directly communicate with the contractor on all issues. <br />▫ Receiving all contractor submittals and RFIs and sending Consultant those which the city desires <br />consultant’s review/response. <br />▫ Review and processing contractor pay requests. <br />▫ Monitoring, tracking, and documenting of all changes during construction necessary to preparing <br />record drawings, including obtaining red-line markups from the contractor. <br />▫ Preparation of “as-constructed” record drawings. <br />▪ The number of RFIs, submittal reviews, and change orders is unknown and actual level of effort for <br />this task will vary. Budget for this task is established from assumed hours for anticipated staff based <br />upon similar assistance provided on previous comparable projects. Task budget to be expanded as <br />necessary as project progresses and consultant will monitor budget status and advise client when the <br />task budget is 85% exhausted to determinate at that time if an amendment should be executed. <br />▪ Project construction assistance services budget is based on providing services for consecutive eight <br />(8) month duration (Construction start through project closeout). <br />▪ Project progress reports and invoicing will be submitted monthly. Invoice backup information <br />(timesheets, mileage and expense logs, etc.) will not be submitted with invoicing, except for copies of <br />subconsultant invoice documentation. Backup information will be made available for staff auditing <br />purposes, if requested. <br />▪ Labor and expense task level-of-effort budgets are estimates and consultant reserves the right to <br />transfer unused task budgets to accomplish other service-task scope activities, if necessary, and only <br />upon approval from the City. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.