My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/05/22 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/05/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 9:57:39 AM
Creation date
5/23/2024 8:34:55 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/22/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SCOPE AND FEE ESTIMATE <br />GEOTECHNICAL ENGINEERING SERVICES <br />WATERMAIN Y CONSTRUCTION <br />CITY OF EVERETT <br />GeoEngineers File No. 0661-137-01 <br />GeoEngineers is pleased to present our proposed scope and fee estimate to provide geotechnical <br />engineering services during construction of the City of Everett Water Main Y reconstruction project. <br />GeoEngineers provided geotechnical design recommendations for the project as summarized in our <br />report dated December 21, 2023. The proposed watermain replacement project includes five segments, <br />one of which will be replacement and upsize of approximately 2,200 LF of existing 6 -inch diameter cast <br />iron pipe with new 8 inch diameter ductile iron along Madrona Avenue. Steep slopes and groundwater <br />seepage are present on this segment, resulting in landslide hazard classification. Additional monitoring <br />requirements are planned for this section including construction survey monitoring of adjacent features, <br />installation of seepage dams, and construction limitations on the length of open trench. Geotechnical <br />consultation and occasional site visits are requested as follows: <br />1. Review the final plans and specifications and respond to RFIs that pertain to geotechnical issues, if <br />required. <br />2. Review the data obtained in the optical survey monitoring. <br />3. Complete 4 to 5 site visits to observe the excavation and shoring methods, seepage/trench dam <br />construction, and overall site conditions during construction. Provide modified geotechnical <br />recommendations as needed, if conditions arise during construction. <br />4. Provide geotechnical engineering consultation on an as-needed basis. <br /> <br />The fee for the services described above be determined on a time and expense basis in accordance with <br />our current schedule of charges (attached). A breakdown of our estimate is attached. <br />We appreciate the opportunity to submit our proposed scope of services and look forward to working with <br />you during construction of the Watermain Y project. If you have any questions regarding the scope of <br />services, please don’t hesitate to call Deb Overbay at 425.861.6024. <br />Attachments: <br />Estimated Fee <br />2024 Schedule of Charges <br /> <br />Disclaimer: Any electronic form, facsimile or hard copy of the original document (email, text, table, and/or figure), if prov ided, and any attachments are <br />only a copy of the original document. The original document is stored by GeoEngineers, Inc. and will serve as the official document of record. <br /> <br />Copyright© 2024 by GeoEngineers, Inc. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.