My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4031-24
>
Ordinances
>
Ordinance 4031-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:23:54 AM
Creation date
5/23/2024 12:04:19 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4031-24
Date
5/22/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
9 <br /> <br />(b) The building, structure, facility, or installation totally replaces the <br />process or production equipment that causes the discharge of <br />pollutants at an existing source; or <br />(c) The production or wastewater generating processes of the <br />building, structure, facility, or installation are substantially <br />independent of an existing source at the same site. In determining <br />whether these are substantially independent factors such as the <br />extent to which the new facility is integrated with the existing <br />plant, and the extent to which the new facility is engaged in the <br />same general type of activity as the existing source should be <br />considered. <br />(2) Construction on a site at which an existing source is located results in a <br />modification rather than a new source, if the construction does not <br />create a new building, structure, facility, or installation meeting the <br />criteria of Section (1)(b) or (c) above but otherwise alters, replaces, or <br />adds to existing process or production equipment. <br />(3) Construction of a new source as defined under this paragraph has <br />commenced if the owner or operator has: <br />(a) Begun, or caused to begin as part of a continuous on-site <br />construction program; <br />(i) any placement, assembly, or installation of facilities or <br />equipment; or <br />ii) significant site preparation work including clearing, <br />excavation, or removal of existing buildings, structures, or <br />facilities which is necessary for the placement, assembly, <br />or installation of new source facilities or equipment; or; <br />(b) Entered into a binding contractual obligation for the purchase of <br />facilities or equipment which are intended to be used in its <br />operation within a reasonable time. Options to purchase or <br />contracts which can be terminated or modified without <br />substantial loss, and contracts for feasibility, engineering, and <br />design studies do not constitute a contractual obligation under <br />this paragraph. <br />AX. New User. A new user is not necessarily a new source and is defined as a user <br />that applies to the City for a new building permit or any person who occupies an <br />existing building and plans to discharge wastewater to the City's collection <br />system after the effective date of this ordinance. Any person that buys an
The URL can be used to link to this page
Your browser does not support the video tag.