My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4031-24
>
Ordinances
>
Ordinance 4031-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:23:54 AM
Creation date
5/23/2024 12:04:19 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4031-24
Date
5/22/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
29 <br /> <br />SECTION 3 - WASTEWATER DISCHARGE PERMIT REQUIREMENTS <br /> <br />3.0 Permit Required <br /> <br />No SIU shall discharge wastewater into the POTW without first obtaining a wastewater <br />discharge permit from the Director. Any violation of the terms and conditions of a <br />wastewater discharge permit shall be deemed a violation of this ordinance and subjects <br />the wastewater discharge permittee to the sanctions set out in this ordinance. <br />Obtaining a wastewater discharge permit does not relieve a permittee of its obligation <br />to comply with all Federal and State pretreatment standards or requirements or with <br />any other requirements of Federal, State, and local law. <br /> <br />The Director may require other users, including liquid waste haulers, to obtain <br />wastewater discharge permits (as necessary) to carry out the purposes of this <br />ordinance. <br /> <br />3.1 Wastewater Discharge Permitting: Existing SIU <br /> <br />Any SIU that was discharging wastewater into the POTW prior to the effective date of <br />this ordinance without an effective wastewater discharge permit and that wishes to <br />continue such discharges in the future shall, within 60 days after notification by the <br />Director submit a permit application to the City in accordance with Section 3.7 of this <br />ordinance, and shall not cause or allow discharges to the POTW to continue after 90 <br />days of the effective date of this ordinance except in accordance with a wastewater <br />discharge permit issued by the Director. <br /> <br />The City's notification to SIUs covered by categorical pretreatment standards will be in <br />reasonable time to ensure that the SIUs complies with the 180-day submittal deadline <br />date established in 40 CFR §403.12 (b).) <br /> <br />3.2 Wastewater Discharge Permitting: New Source and New User <br /> <br />At least 90 days prior to the anticipated start -up, new sources, sources that become a <br />user subsequent to the promulgation of an applicable categorical pretreatment <br />standard, and new users that are determined to be SIU, shall apply for a wastewater <br />discharge permit and will be required to submit to the City at least the information <br />listed in paragraphs (A)-(E) of Section 3.7 of this ordinance. A new source, or new user <br />that is determined to be a SIU, cannot discharge without first receiving a wastewater <br />discharge permit from the City. New sources, and new users that are determined to be <br />SIU's, shall also be required to include in their application information on the method of
The URL can be used to link to this page
Your browser does not support the video tag.