Laserfiche WebLink
43 <br /> <br />that the City may accept reports of average and maximum flows estimated by <br />verifiable techniques if the City determines that an actual measurement is not <br />feasible. <br /> <br /> H. Sampling shall be representative of the user's daily operations and shall be taken <br />in accordance with the requirements specified in Section 5 of this ordinance. <br /> <br /> I. The City may require reporting by users that are not required to have an <br />industrial wastewater discharge permit if information or data is needed to <br />establish a sewer charge, determine the treatability of the effluent or determine <br />any other factor that is related to the operation and maintenance of the sewer <br />system. <br /> <br /> J. The City may require self-monitoring by the user or, if requested by the user, <br />may agree to perform the periodic compliance monitoring needed to prepare <br />the periodic compliance report required under this section. If the City agrees to <br />perform such periodic compliance monitorin g, it may charge the user for such <br />monitoring, based upon the costs incurred by the City for the sampling and <br />analyses. Any such charges shall be added to the normal sewer charge and shall <br />be payable as part of the utility bills. The City is under no obligation to perform <br />periodic compliance monitoring for a user. <br /> <br /> K. All periodic compliance reports must be signed and certified in accordance with <br />section 3.8 and their applicable discharger classification. <br /> <br />4.4 Compliance Schedules for Meeting Applicable Pretreatment Standards <br /> <br />In any situation where a compliance schedule is issued by the City, the following <br />conditions shall be met. <br /> <br />A. The schedule shall contain increments of progress in the form of dates for the <br />commencement and completion of major events leading to the construction and <br />operation of additional pretreatment required for the user to meet the applicable <br />pretreatment standards (e.g., hiring an engineer, completing preliminary plans, <br />completing final plans, executing contract for major components, commencing <br />construction, completing construction, etc.). <br /> <br /> B. No increment referred to in paragraph (A) of this section shall exceed nine (9) <br />months. <br /> <br /> C. Not later than 14 days following each date in the schedule and the final date for <br />compliance, the user shall submit a progress report to the City including, at a <br />minimum, whether or not it complied with the increment of progress to be met