Laserfiche WebLink
Project: City of Everett reservoir 3 <br />Quotation: Q-217118-20240405-1659 <br />Item Description Qty <br />0 Packing - Skid, Poly Bag 10Larger Battery Rack 10Extension - Oil Drain 10Green Sound Level 2 Intake Baffle - Ship Loose 10Ship Loose - Vent Kit A 1 <br />3 Sound Level2 Baffle, Shipped Loose 1 <br />4 Fuel Tank, Extension Kit-1 Normal, 2 Emergency, 12ft 1 <br />5 Generator Starting Batteries 2 <br />6 OTECB, OTEC Transfer Switch-Electronic Control: 225A 1 <br />0 OTEC225, Transfer Switch, PowerCommand, 225 Amp 10Listing - UL 1008/CSA Certification 10IBC Seismic Certification 10Application - Utility to Genset 10Cabinet - Type 1 10Poles - 3 (Solid Neutral)10Frequency - 60 Hz 10System - 3 Phase, 3 or 4 Wire 10Voltage - 480 Volts AC 10Genset Starting Battery - 12V DC 10PC40 Control 10Aux Relay - Emergency Position - 12 Volts DC 10Aux Relay - Normal Position - 12 Volts DC 10Interface - Communications Network, MODBUS RTU Module 10Terminal Block - 30 Points 10Relay - Elevator Signal 10Transfer Switch Warranty - 2 Year Comprehensive 1 <br />7 Annunciator-Panel Mounted With Enclosure (RS485)1 <br />8 Factory direct delivery, off-loading by others. No additional storage, handling or rerouting included. Flatbed <br />delivery is available for an additional charge.  <br />1 <br />9 Startup & System Testing, 2hr Load Bank Test, Building Transfer, Install Batteries, Training During Startup Visit, 1 <br />Day. <br />1 <br />TOTAL: $ 63,850.00 <br />  <br />Quote value does not include any tax. <br />  <br />EXCEPTIONS AND CLARIFICATIONS: <br />  <br />COVID 19 SUPPLEMENTAL STATEMENT <br />AS A RESULT OF THE OUTBREAK OF THE DISEASE COVID-19 ARISING FROM THE NOVEL CORONAVIRUS, TEMPORARY <br />DELAYS IN DELIVERY, LABOUR OR SERVICES FROM CUMMINS AND ITS SUB-SUPPLIERS OR SUBCONTRACTORS MAY <br />OCCUR. AMONG OTHER FACTORS, CUMMINS' DELIVERY OBLIGATIONS ARE SUBJECT TO CORRECT AND PUNCTUAL <br />SUPPLY FROM OUR SUB-SUPPLIERS OR SUBCONTRACTORS, AND CUMMINS RESERVES THE RIGHT TO MAKE PARTIAL <br />DELIVERIES OR MODIFY ITS LABOUR OR SERVICE. WHILE CUMMINS SHALL MAKE EVERY COMMERCIALLY REASONABLE <br />EFFORT TO MEET THE DELIVERY, SERVICE OR COMPLETION OBLIGATIONS SET FORTH HEREIN, SUCH DATES ARE <br />SUBJECT TO CHANGE. <br />INTERNATIONAL BUILDING CODE (IBC) CERTIFICATION <br />The products in this quotation identified as meeting the requirements of the 2009 IBC have been certified by their respective <br />manufactures via a combination of analytical testing and shaker table testing. Not all products have been shaker table tested. <br />OFFICE OF STATEWIDE HEALTH PLANNING AND DEVELOPMENT (OSHPD) <br />OSHPD seismic requirements are continuing to evolve. Please contact Cummins for the most current requirements for meeting OSHPD <br />applications.  <br />SELECTIVE COORDINATION FOR NATIONAL ELECTRIC CODE (NEC) ARTICLE 700 AND 701 LOADS <br />Cummins generators are equipped with the manufacturer's recommended circuit breaker. Information regarding this device can be <br />supplied upon request. This quotation is not valid if any changes to this circuit breaker(s) is required to coordinate with other devices <br />in the electrical distribution system. If changes are required, the customer must provide a copy of the coordination study listing the <br />manufacturers part number of the disconnect device to be supplied with the generator and a revised quotation will be issued. <br />TRANSFER SWITCH WITHSTAND AND CLOSE RATINGS <br />   <br />Quotation: Q-217118-20240405-1659 <br />  <br />Page 2 of 9