Laserfiche WebLink
Project: City of Everett reservoir 3 <br />Quotation: Q-217118-20240405-1659 <br />Transfer switch(es), if included in this quotation, require a withstand and closing rating (WCR) capable of meeting the available <br />upstream fault current (kAIC). The WCR may be based on a specific breaker rating or a time-based rating, and it is the responsibility of <br />a qualified facility designer or engineer to verify compatibility. In the event that the proposed transfer switch(es) are not compatible, the <br />transfer switch(es) will need to be re-quoted to ensure compatibility. A full listing of the WCR can be provided upon request and will be <br />included as part of the submittal package.  <br />  <br />CUMMINS STANDARD EXCLUSIONS <br />Exhaust System  <br />All off-engine piping, hangers, flanges, gaskets, bolts, insulation, other materials and labor to install. <br />Fuel System  <br />All fuel piping and materials not limited to; supply, return, venting, valves, coolers, filters, pumps, fittings, primary fuel regulator, storage <br />tank & senders, external to genset package. All fuel for testing and initial fill. Fuel tank vent extensions and flame arrestors unless <br />specifically listed in the Bill of Materials.  <br />Cooling System <br />Intake louvers, exhaust louvers, air dampers, sheet metal ducting, flex adapters, sound <br />attenuators/baffles. All off engine piping, flexible connections, labor and coolant for remote cooling systems.  <br />Electrical  <br />All off-engine wiring, field terminations of wiring, and lugs other than those detailed in our submittal. Mounting  <br />Mounting bolts and anchors. Vibration isolators (if included) may be shipped loose for installation at the jobsite by others. Seismic <br />engineering calculations.  <br />Electrical Testing <br />Not limited to International Electrical Testing Association (NETA), infrared scanning, harmonic content or other independent agency <br />testing of switchgear, switchboards, protective relays, circuit breaker, electrical coordination studies, arc flash studies and reactive load <br />site testing. <br />Environmental Testing <br />Environmental Protection Agency (EPA), local air quality district or other Authority Having Jurisdiction <br />(AHJ), including acoustical.  <br />Programming <br />All protective relay settings, breaker settings, PLC programming or other user configurable device programming.  <br />Documentation <br />Electronic submittals and operation and maintenance manuals will be provided. Printed copies are available upon request, additional <br />charges may apply.  <br />Miscellaneous  <br />Site specific labeling. Exhaust backpressure, airflow restriction or vibration analysis <br />Design  <br />Cummins is not responsible for system design or engineering and does not guarantee system performance standards. Cummins will <br />supply documentation and reasonable assistance to others responsible for system engineering, design and performance.  <br />Taxes and Permit  <br />Any applicable sales tax, permits, fees, licenses.  <br />Bonds  <br />Any bid bond, payment or performance bond or other type of bond. <br />All items listed above are excluded and will only be supplied by Cummins if agreed upon, in writing, by a sales representative for <br />Cummins.  <br />  <br />  <br />  <br />NOTES: <br />  <br />This proposal is based on specification section 263214 and 263600 dated March 2024. We know of no one line. <br />  <br />LEAD TIME: <br />  <br />Submittal <br />Typical submittal lead time is 3 - 4 weeks after receipt of purchase order.  <br />Equipment <br />Generator - Current lead-time is 38 - 40 weeks after submittal approval and release for production. <br />ATS- Current lead-time is 18 - 20 weeks after submittal approval and release for production. <br />  <br />Please feel free to contact me if you require any additional information; or if you have any further questions or concerns that I may be of <br />assistance with. <br />  <br />   <br />Quotation: Q-217118-20240405-1659 <br />  <br />Page 3 of 9