Project: City of Everett reservoir 3
<br />Quotation: Q-217118-20240405-1659
<br />Transfer switch(es), if included in this quotation, require a withstand and closing rating (WCR) capable of meeting the available
<br />upstream fault current (kAIC). The WCR may be based on a specific breaker rating or a time-based rating, and it is the responsibility of
<br />a qualified facility designer or engineer to verify compatibility. In the event that the proposed transfer switch(es) are not compatible, the
<br />transfer switch(es) will need to be re-quoted to ensure compatibility. A full listing of the WCR can be provided upon request and will be
<br />included as part of the submittal package.
<br />
<br />CUMMINS STANDARD EXCLUSIONS
<br />Exhaust System
<br />All off-engine piping, hangers, flanges, gaskets, bolts, insulation, other materials and labor to install.
<br />Fuel System
<br />All fuel piping and materials not limited to; supply, return, venting, valves, coolers, filters, pumps, fittings, primary fuel regulator, storage
<br />tank & senders, external to genset package. All fuel for testing and initial fill. Fuel tank vent extensions and flame arrestors unless
<br />specifically listed in the Bill of Materials.
<br />Cooling System
<br />Intake louvers, exhaust louvers, air dampers, sheet metal ducting, flex adapters, sound
<br />attenuators/baffles. All off engine piping, flexible connections, labor and coolant for remote cooling systems.
<br />Electrical
<br />All off-engine wiring, field terminations of wiring, and lugs other than those detailed in our submittal. Mounting
<br />Mounting bolts and anchors. Vibration isolators (if included) may be shipped loose for installation at the jobsite by others. Seismic
<br />engineering calculations.
<br />Electrical Testing
<br />Not limited to International Electrical Testing Association (NETA), infrared scanning, harmonic content or other independent agency
<br />testing of switchgear, switchboards, protective relays, circuit breaker, electrical coordination studies, arc flash studies and reactive load
<br />site testing.
<br />Environmental Testing
<br />Environmental Protection Agency (EPA), local air quality district or other Authority Having Jurisdiction
<br />(AHJ), including acoustical.
<br />Programming
<br />All protective relay settings, breaker settings, PLC programming or other user configurable device programming.
<br />Documentation
<br />Electronic submittals and operation and maintenance manuals will be provided. Printed copies are available upon request, additional
<br />charges may apply.
<br />Miscellaneous
<br />Site specific labeling. Exhaust backpressure, airflow restriction or vibration analysis
<br />Design
<br />Cummins is not responsible for system design or engineering and does not guarantee system performance standards. Cummins will
<br />supply documentation and reasonable assistance to others responsible for system engineering, design and performance.
<br />Taxes and Permit
<br />Any applicable sales tax, permits, fees, licenses.
<br />Bonds
<br />Any bid bond, payment or performance bond or other type of bond.
<br />All items listed above are excluded and will only be supplied by Cummins if agreed upon, in writing, by a sales representative for
<br />Cummins.
<br />
<br />
<br />
<br />NOTES:
<br />
<br />This proposal is based on specification section 263214 and 263600 dated March 2024. We know of no one line.
<br />
<br />LEAD TIME:
<br />
<br />Submittal
<br />Typical submittal lead time is 3 - 4 weeks after receipt of purchase order.
<br />Equipment
<br />Generator - Current lead-time is 38 - 40 weeks after submittal approval and release for production.
<br />ATS- Current lead-time is 18 - 20 weeks after submittal approval and release for production.
<br />
<br />Please feel free to contact me if you require any additional information; or if you have any further questions or concerns that I may be of
<br />assistance with.
<br />
<br />
<br />Quotation: Q-217118-20240405-1659
<br />
<br />Page 3 of 9
|