Laserfiche WebLink
Part 2—Automatic Functional Test: PASS FAIL N/A <br /> 1. Reset System-The contractor shall reset the system and ensure that the El ❑ F1 <br /> equipment under the hood is on and power/gas is being supplied. <br /> 2. Activate Fusible Link-Initiate the automatic functional test by having the D El El <br /> contractor activate the most remote fusible link or detector. <br /> 3. Fire Alarm Activation-If the building is equipped with a fire alarm system,did the E] <br /> 1-1 <br /> activation of the system activate local notification device/bell and activate an <br /> alarm signal(clearly illustrating the type and location of alarm) at the fire alarm <br /> panel? <br /> 4. Power& Fuel Shutdown-Did the activation of the system shut down power and <br /> fuel supply to ALL equipment protected under the hood and the makeup air <br /> suppling the hood?Does it have to be manually reset after system activation? <br /> 5. Exhaust Fan-Did the activation of the system turn on or keep on the exhaust fan <br /> and did they continue to operate during and after then system discharge? <br /> 6. Visual Indicator-Did the visual indicator on the control head illustrate that the El El El <br /> system has operated? <br /> Returning System to Operational Condition <br /> PASS FAIL N/A <br /> 1. Operational Conditions-After completion of all functional testing,the following El F] 0 <br /> shall be done to return the system to operational conditions: <br /> • Each agent tank shall be reconnected. <br /> • All power/gas has been restored. <br /> • If the system is connected to an alarm,the alarm shall be taken off test. <br /> • All cooking equipment shall be in its approved locations. <br /> • All grease filters shall be installed. <br /> • The contractor verifies that the system is fully operational. <br /> 2. NFPA 17 Report-Prior to final approval the installing contractor shall complete, <br /> sign, and provide a copy of the NFPA 17A acceptance test report. <br /> Fire Marshal's Office 1425.257.8100 1 everelthva.gov/fire I INFORMATION HANDOUT C-10 14.29.2020 I Pap] <br />