My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 96 DIVISION5.GR5 1 Division 5 2 Surface Treatments and Pavements 3 4 5-04.GR5 5 Hot Mix Asphalt 6 7 5-04.RTF 8 5-04 Hot Mix Asphalt 9 (July 18, 2018 APWA GSP) 10 11 Delete Section 5-04 and amendments, Hot Mix Asphalt and replace it with the following: 12 13 5-04.1 Description 14 This Work shall consist of providing and placing one or more layers of plant-mixed hot 15 mix asphalt (HMA) on a prepared foundation or base in accordance with these 16 Specifications and the lines, grades, thicknesses, and typical cross-sections shown 17 in the Plans. The manufacture of HMA may include warm mix asphalt (WMA) processes 18 in accordance with these Specifications. WMA processes include organic additives, 19 chemical additives, and foaming. 20 21 HMA shall be composed of asphalt binder and mineral materials as may be required, 22 mixed in the proportions specified to provide a homogeneous, stable, 23 and workable mixture. 24 25 5-04.2 Materials 26 Materials shall meet the requirements of the following sections: 27 Asphalt Binder 9-02.1(4) 28 Cationic Emulsified Asphalt 9-02.1(6) 29 Anti-Stripping Additive 9-02.4 30 HMA Additive 9-02.5 31 Aggregates 9-03.8 32 Recycled Asphalt Pavement 9-03.8(3)B 33 Mineral Filler 9-03.8(5) 34 Recycled Material 9-03.21 35 Portland Cement 9-01 36 Sand 9-03.1(2) 37 (As noted in 5-04.3(5)C for crack sealing) 38 Joint Sealant 9-04.2 39 Foam Backer Rod 9-04.2(3)A 40 The Contract documents may establish that the various mineral materials required for 41 the manufacture of HMA will be furnished in whole or in part by the Contracting Agency. 42 If the documents do not establish the furnishing of any of these mineral materials by the 43 Contracting Agency, the Contractor shall be required to furnish such materials in the 44 amounts required for the designated mix. Mineral materials include coarse and fine 45 aggregates, and mineral filler. 46 47
The URL can be used to link to this page
Your browser does not support the video tag.