Laserfiche WebLink
Edgewater Creek Bridge Replacement November 2023 124 The unit Contract price per ton for “Asphalt for Prime Coat” shall be full payment for all 1 costs incurred to obtain, provide and install the material in accordance with Section 5-2 04.3(4). 3 4 “Prime Coat Agg.”, per cubic yard, or per ton. 5 6 The unit Contract price per cubic yard or per ton for “Prime Coat Agg.” shall be full pay 7 for furnishing, loading, and hauling aggregate to the place of deposit and spreading the 8 aggregate in the quantities required by the Engineer. 9 10 “Asphalt for Fog Seal”, per ton. 11 12 Payment for “Asphalt for Fog Seal” is described in Section 5-02.5. 13 14 “Longitudinal Joint Seal”, per linear foot. 15 16 The unit Contract price per linear foot for “Longitudinal Joint Seal” shall be full payment 17 for all costs incurred to perform the Work described in Section 5-04.3(12). 18 19 “Planing Bituminous Pavement”, per square yard. 20 21 The unit Contract price per square yard for “Planing Bituminous Pavement” shall be full 22 payment for all costs incurred to perform the Work described in Section 5-04.3(14). 23 24 “Temporary Pavement Marking”, per linear foot. 25 26 Payment for “Temporary Pavement Marking” is described in Section 8-23.5. 27 28 “Water”, per M gallon. 29 30 Payment for “Water” is described in Section 2-07.5. 31 32 “Job Mix Compliance Price Adjustment”, by calculation. 33 34 “Job Mix Compliance Price Adjustment” will be calculated and paid for as described in 35 Section 5-04.3(9)C6. 36 37 “Compaction Price Adjustment”, by calculation. 38 39 “Compaction Price Adjustment” will be calculated and paid for as described in Section 5-40 04..3(10)D3. 41 42 “Roadway Core”, per each. 43 44