My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 124 The unit Contract price per ton for “Asphalt for Prime Coat” shall be full payment for all 1 costs incurred to obtain, provide and install the material in accordance with Section 5-2 04.3(4). 3 4 “Prime Coat Agg.”, per cubic yard, or per ton. 5 6 The unit Contract price per cubic yard or per ton for “Prime Coat Agg.” shall be full pay 7 for furnishing, loading, and hauling aggregate to the place of deposit and spreading the 8 aggregate in the quantities required by the Engineer. 9 10 “Asphalt for Fog Seal”, per ton. 11 12 Payment for “Asphalt for Fog Seal” is described in Section 5-02.5. 13 14 “Longitudinal Joint Seal”, per linear foot. 15 16 The unit Contract price per linear foot for “Longitudinal Joint Seal” shall be full payment 17 for all costs incurred to perform the Work described in Section 5-04.3(12). 18 19 “Planing Bituminous Pavement”, per square yard. 20 21 The unit Contract price per square yard for “Planing Bituminous Pavement” shall be full 22 payment for all costs incurred to perform the Work described in Section 5-04.3(14). 23 24 “Temporary Pavement Marking”, per linear foot. 25 26 Payment for “Temporary Pavement Marking” is described in Section 8-23.5. 27 28 “Water”, per M gallon. 29 30 Payment for “Water” is described in Section 2-07.5. 31 32 “Job Mix Compliance Price Adjustment”, by calculation. 33 34 “Job Mix Compliance Price Adjustment” will be calculated and paid for as described in 35 Section 5-04.3(9)C6. 36 37 “Compaction Price Adjustment”, by calculation. 38 39 “Compaction Price Adjustment” will be calculated and paid for as described in Section 5-40 04..3(10)D3. 41 42 “Roadway Core”, per each. 43 44
The URL can be used to link to this page
Your browser does not support the video tag.