Laserfiche WebLink
Edgewater Creek Bridge Replacement November 2023 123 1 “Commercial HMA”, per ton. 2 3 The unit Contract price per ton for “HMA Cl. ___ PG ___”, “HMA for Approach Cl. ___ 4 PG ___”, “HMA for Preleveling Cl. ___ PG ___”, “HMA for Pavement Repair Cl. ___ PG 5 ___”, and “Commercial HMA” shall be full compensation for all costs, including anti-6 stripping additive, incurred to carry out the requirements of Section 5-04 except for those 7 costs included in other items which are included in this Subsection and which are 8 included in the Proposal. 9 10 “Preparation of Untreated Roadway”, per mile. 11 12 The unit Contract price per mile for “Preparation of Untreated Roadway” shall be full pay 13 for all Work described under 5-04.3(4) , with the exception, however, that all costs 14 involved in patching the Roadway prior to placement of HMA shall be included in the unit 15 Contract price per ton for “HMA Cl. ___ PG ___” which was used for patching. If the 16 Proposal does not include a Bid item for “Preparation of Untreated Roadway”, the 17 Roadway shall be prepared as specified, but the Work shall be included in the Contract 18 prices of the other items of Work. 19 20 “Preparation of Existing Paved Surfaces”, per mile. 21 22 The unit Contract Price for “Preparation of Existing Paved Surfaces” shall be full pay for 23 all Work described under Section 5-04.3(4) with the exception, however, that all costs 24 involved in patching the Roadway prior to placement of HMA shall be included in the unit 25 Contract price per ton for “HMA Cl. ___ PG ___” which was used for patching. If the 26 Proposal does not include a Bid item for “Preparation of Untreated Roadway”, the 27 Roadway shall be prepared as specified, but the Work shall be included in the Contract 28 prices of the other items of Work. 29 30 “Crack Sealing”, by force account. 31 32 “Crack Sealing” will be paid for by force account as specified in Section 1-09.6. For the 33 purpose of providing a common Proposal for all Bidders, the Contracting Agency has 34 entered an amount in the Proposal to become a part of the total Bid by the Contractor. 35 36 “Pavement Repair Excavation Incl. Haul”, per square yard. 37 38 The unit Contract price per square yard for “Pavement Repair Excavation Incl. Haul” 39 shall be full payment for all costs incurred to perform the Work described in Section 5-40 04.3(4) with the exception, however, that all costs involved in the placement of HMA 41 shall be included in the unit Contract price per ton for “HMA for Pavement Repair Cl. ___ 42 PG ___”, per ton. 43 44 “Asphalt for Prime Coat”, per ton. 45 46