Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 151 7-04.4.OPT1.DOCX 1 (******) 2 Pipe anchors and deadman anchors will be measured per each. 3 4 The length of HDPE storm sewer pipe will be the number of linear feet of completed 5 installation, measured along the invert from the end of pipe to the end of pipe. 6 7 7-04.5.DOCX 8 Payment 9 10 7-04.5.INST1.DOCX 11 Section 7-04.5 is supplemented with the following: 12 13 7-04.5.OPT1.DOCX 14 (******) 15 The unit Contract price per linear foot for storm sewer pipe of the kind and size specified 16 shall be full pay for all Work to complete the installation, bedding material, native or 17 imported trench backfill, compaction, disposal of native excavated materials not used for 18 backfill, testing, the vertical pipe bend for transitioning the buried HDPE pipe to the 19 surface installed HDPE pipe, and minor grading required to ensure proper seating. 20 21 “Pipe Anchor Type ___”, per each. 22 The unit Contract price per each for “Pipe Anchor Type ___” shall be full payment to 23 provide and install the pipe anchors, including plates, coupling bands, hardware, stakes, 24 Manta Ray soil anchors, and any required pre-drilling for Manta Ray mechanical soil 25 anchors. 26 27 “Deadman Anchor”, per each. 28 The unit Contract price per each for “Deadman Anchor” shall be full payment to provide 29 and install the deadman anchor, including flange joint, Class 4000 cement concrete, and 30 reinforcing steel. 31 32 “High Density Polyethylene Pipe 10 In. Diam.”, per linear foot. 33 The unit Contract price per linear foot for “High Density Polyethylene Pipe 10 In. Diam.” 34 shall be full pay for all costs, including labor, equipment, and materials to furnish and 35 install the new stormwater pipe by replacing the existing stormwater pipe. This includes 36 but is not limited to: joining pipe; bypass plan; bypass pumping; providing test samples 37 for butt fusion welds; saw cutting asphalt; removal and disposal of roadway pavement 38 section; testing; pipe cleaning; pipe inspections and inspection reports; and video 39 inspection. 40 41 No separate or additional payment will be made for additional testing, cleaning, and video 42 inspection required as a result of correction of unsatisfactory Work. 43 44 7-05.DOCX 45 Manholes, Inlets, Catch Basins, and Drywells 46 47 7-05.3.DOCX 48 Construction Requirements 49 50