My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 152 7-05.3.INST1.DOCX 1 Section 7-05.3 is supplemented with the following: 2 3 7-05.3.OPT1.DOCX 4 (******) 5 Flow Control Structure shall be constructed in accordance with the detail as shown in the 6 Plans. 7 8 7-05.3.OPT2.DOCX 9 (******) 10 Connections to Existing Structures 11 Where shown in the Plans, the Contractor shall connect new drainage pipe to existing 12 drainage Structures such as catch basins, manholes, and inlets, or shall connect new 13 drainage Structures such as catch basins, manholes, and inlets to existing drainage pipe, 14 or shall connect new drainage pipe to existing drainage pipe with pipe coupler. 15 16 7-05.3(1).DOCX 17 Adjusting Manholes and Catch Basins to Grade 18 19 7-05.3(1).INST1.DOCX 20 Section 7-05.3(1) is supplemented with the following: 21 22 7-05.3(1).OPT1.DOCX 23 (******) 24 All manholes and catch basins shall be adjusted to finished grade after paving 25 operations are complete. The Contractor shall adjust the structure using concrete 26 brick or adjustment rings, or by other necessary means approved by the Engineer, 27 in accordance with Contracting Agency standards, to the satisfaction of the Engineer. 28 All catch basins and manholes for storm sewers shall be grouted water tight, 29 including under frames, rims, manhole barrel, riser sections, and pipe collars. 30 31 7-05.4.DOCX 32 Measurement 33 34 7-05.4.INST1.DOCX 35 The third paragraph of Section 7-05.4 is revised to read as follows: 36 37 7-05.4.OPT1.DOCX 38 (******) 39 Adjustment of manholes, catch basins, and inlets will be made separately per each 40 Drainage Structure after adjusting to finished grade. 41 42 7-05.5.DOCX 43 Payment 44 45 7-05.5.INST1.DOCX 46 Section 7-05.5 is supplemented with the following: 47
The URL can be used to link to this page
Your browser does not support the video tag.