My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 156 Pipe laying shall be in accordance with Section 7-08.3(2) of the Standard Specifications. 1 48” diameter detention pipe shall be installed as detailed in the Plans. 2 3 Backfilling 4 Placement of pipe zone backfill shall be performed in accordance with these 5 requirements. Excavations shall be backfilled as soon after the pipe laying as possible. 6 7 Pipe zone backfill shall be placed in loose layers and compacted to ninety percent (90%) 8 maximum density. Backfill shall be brought up simultaneously on each side of the pipe to 9 the top of the pipe zone. The pipe shall then be covered to the top of the pipe zone and 10 the materials compacted in a manner to avoid damaging or disturbing the completed pipe. 11 12 Backfill above the pipe zone shall be accomplished in such a manner that the pipe will 13 not be shifted out of position nor damaged by impact or overloading. If pipe is being placed 14 under existing paved areas, or Roadways, backfill above the pipe zone shall be placed in 15 horizontal layers no more than 8 inches thick and compacted to ninety percent (90%) 16 maximum density. All compaction shall be in accordance with the Compaction Control 17 Test of Section 2-03.3(14)D. 18 19 Excavated native material shall be used for backfill in the zone above the construction 20 geotextile if it meets the requirements of Section 9-03.14(3), Common Borrow. Materials 21 determined by the Engineer to be unsuitable for backfill at the time of excavation or that 22 do not meet the requirements for Common Borrow shall be removed and replaced with 23 imported backfill material. 24 25 Backfilling of trenches in the vicinity of catch basins, manholes, or other appurtenances 26 will not be permitted until the cement in the masonry has become thoroughly hardened. 27 28 The Contractor shall not operate tractors or other heavy equipment over the top of the 29 pipe until the backfill has reached a height of two (2) feet above the top of the pipe. 30 31 Measurement 32 No specific unit of measurement will apply to the lump sum item “48 In. Detention Pipe”. The 33 limits of measurement for “48 In. Detention Pipe” are as follows: 34 35 Horizontal Limits: The outside edge of the 48 In. Detention Pipe trench as dimensioned 36 in the Plans and corresponding with the horizontal limits of construction geotextile. 37 38 Lower Limit: The bottom of the gravel bedding, as shown in the Plans. 39 40 Upper Limit: The construction geotextile above the 48 In. diameter detention pipe and 41 backfill materials shall be considered the top of the 48 In. Detention Pipe. 42 43 Payment 44 Payment will be made for the following bid item when included in the proposal: 45 46 "48 In. Detention Pipe", lump sum. 47 48 The lump sum Contract payment for “48 In. Detention Pipe” shall be full compensation for all 49 costs incurred for constructing a complete detention facility, including Structure excavation 50 including haul, furnishing, installing and compacting crushed surfacing base course; furnishing 51 and installing detention pipe, including sections of the detention pipe for connection to catch 52
The URL can be used to link to this page
Your browser does not support the video tag.