My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 155 Description 1 This Work consists of constructing a detention pipe in accordance with the Plans, these 2 Specifications, and as staked. 3 4 Materials 5 Materials shall meet the requirements of the following Sections: 6 7 Crushed Surfacing Base Course 9-03.9(3) 8 Corrugated Aluminum Pipe 12 Gage minimum 9-05.5 9 High Density Polyethylene Pipe 9-05.23 10 Corrugated Polyethylene Storm Sewer Pipe 9-05.20 11 Steel Rib Reinforced Polyethylene Pipe 9-05.22 12 13 Construction Requirements 14 The intent of the detention pipe is to store stormwater runoff and release it slowly over time. 15 The Contractor shall include proposed methods to prevent silt laden construction runoff in the 16 Temporary Erosion and Sedimentation Control (TESC) Plan. 17 18 Excavation 19 Excavations shall either be closed up at the end of the day or protected per Section 1-20 07.23(1). 21 22 The width and depth of the excavation for the detention pipe shall be as shown in the 23 Plans. Placement of bedding material shall precede the installation of all pipe. This shall 24 include necessary leveling of the native bottom of the excavation or the top of the 25 foundation material as well as placement and compaction of required bedding material to 26 a uniform grade so that the entire length of pipe will be supported on a uniformly dense 27 unyielding foundation. 28 29 The Contractor shall furnish, install, and operate all necessary equipment to keep 30 excavations above the foundation level free from water during construction, and shall 31 dewater and dispose of the water so as not to cause injury to public or private property or 32 nuisance to the public. Sufficient pumping equipment in good working condition shall be 33 available at all times for all emergencies, including power outage, and shall have available 34 at all times competent workers for the operation of the pumping equipment. 35 36 Bedding the Pipe 37 Pipe zone bedding material shall provide uniform support along the entire pipe barrel, 38 without load concentration at joint collars or bells. All adjustment to line and grade shall 39 be made by scraping away or filling in with bedding material under the body of the pipe 40 and not by blocking or wedging. Bedding disturbed by pipe movement, or by removal of 41 shoring movement of a trench shield or box, shall be reconsolidated prior to backfill. 42 43 Pipe zone bedding shall be as specified in City of Everett Standard Drawing No. 418 and 44 shall be placed in loose layers and compacted to ninety percent (90%) maximum density. 45 Bedding shall be placed, spread, and compacted before the pipe is installed so that the 46 pipe is uniformly supported along the barrel. Lifts of not more than eight (8) inches in 47 thickness shall be placed and compacted along the sides of the pipe to the height shown 48 in the Plans. Material shall be worked carefully under the pipe haunches and then 49 compacted. 50 51 Pipe Laying 52
The URL can be used to link to this page
Your browser does not support the video tag.