My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 160 2” 95 100 1 1” 70 100 2 5/8 0 50 3 No. 4 0 30 4 5 At the Engineer’s request, prior to delivery the Contractor shall provide the following: 6 1. The source of the product and species of trees included in it; 7 2. A sieve analysis verifying the product meets the above size gradation 8 requirement; 9 10 The Engineer may specify the following chipped woody materials, meeting the above 11 size gradation, weed-free, and inert material requirements, as acceptable substitutes 12 for Arborist Wood Chip Mulch: 13 a) Chips derived from composting operation screening (“overs”); 14 b) Chips derived from whole tree grinding (“hog fuel”); 15 c) Chips derived from recycling of clean dimensional lumber (e.g. pallets or 16 framing lumber) that has passed through a metal removal process to meet 17 the 1/2% manufactured inert standard above. 18 19 8-02.3.GR8 20 Construction Requirements 21 22 8-02.3(4).GR8 23 Topsoil 24 25 8-02.3(4).INST1.DOCX 26 The last sentence of the third paragraph of Section 8-02.3(4) is deleted and replaced with 27 the following: 28 29 8-02.3(4).OPT1.DOCX 30 (******) 31 After the topsoil has been spread, all large clods, hard lumps and rocks one (1) inch 32 in diameter and larger, and litter shall be raked up, removed, and disposed of by the 33 Contractor. 34 35 8-02.3(4).INST2.DOCX 36 Section 8-02.3(4) is supplemented with the following: 37 38 8-02.3(4).OPT2.DOCX 39 (******) 40 After the Subgrade of tree and shrub planting areas have been graded and cleared 41 of all debris and construction materials, the Contractor shall install Fine Compost Soil 42 Amendment and per Soil Restoration Detail shown on the Planting Plan. 43 44 8-02.3(13).GR8 45 Plant Establishment 46 47 8-02.3(13).INST1.DOCX 48 Section 8-02.3(13) is supplemented with the following: 49 50
The URL can be used to link to this page
Your browser does not support the video tag.