My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 161 8-02.3(13).OPT2.DOCX 1 (WSDOT NWR December 16, 2002) 2 The Plant Establishment Plan shall show the scheduling, frequency, dates, materials 3 and equipment utilized, whichever may apply, for all plant establishment activities 4 including, but not limited to, the following: 5 6 A. Plant Establishment Activities 7 8 1. Weed Control for Target Weeds within Planting Areas 9 a. Hand weeding and removal 10 2. Fertilizing 11 3. Watering 12 4. Litter and Debris Removal 13 5. Pruning 14 6. Insect and Disease Control 15 7. Erosion Control Methods and Procedures 16 8. Plant Replacement. 17 18 During the plant establishment period(s) after first year plant establishment, the 19 Contractor shall perform all Work necessary for the continued healthy and vigorous 20 growth of all plant material as directed by the Engineer. 21 22 8-02.3(13).OPT3.DOCX 23 (WSDOT NWR January 17, 2006) 24 B. Irrigation System 25 26 1. Winterization and Procedure 27 2. Spring Start-up and Procedure 28 3. Cross-Connection Control Device - Annual Testing and Inspection for 29 Complete Operation 30 31 8-02.3(17).SA1.DOCX 32 (******) 33 Add the following new section: 34 35 8-02.3(17) Park Restoration 36 The Contractor shall restore areas of Edgewater Park used for construction staging 37 following completion of construction staging, or as directed by the Engineer. The 38 Contractor shall remove non-native material used for grading of the staging area, remove 39 the existing modular block wall, and grade the park area following removal of non-native 40 material and the modular block wall as detailed in the Plans. 41 42 All Park Restoration Work shall be done prior to vegetation restoration. 43 44 8-02.4.GR8 45 Measurement 46 47 8-02.4.INST1.GR8 48 Section 8-02.4 is supplemented with the following: 49 50
The URL can be used to link to this page
Your browser does not support the video tag.