Laserfiche WebLink
Edgewater Creek Bridge Replacement November 2023 161 8-02.3(13).OPT2.DOCX 1 (WSDOT NWR December 16, 2002) 2 The Plant Establishment Plan shall show the scheduling, frequency, dates, materials 3 and equipment utilized, whichever may apply, for all plant establishment activities 4 including, but not limited to, the following: 5 6 A. Plant Establishment Activities 7 8 1. Weed Control for Target Weeds within Planting Areas 9 a. Hand weeding and removal 10 2. Fertilizing 11 3. Watering 12 4. Litter and Debris Removal 13 5. Pruning 14 6. Insect and Disease Control 15 7. Erosion Control Methods and Procedures 16 8. Plant Replacement. 17 18 During the plant establishment period(s) after first year plant establishment, the 19 Contractor shall perform all Work necessary for the continued healthy and vigorous 20 growth of all plant material as directed by the Engineer. 21 22 8-02.3(13).OPT3.DOCX 23 (WSDOT NWR January 17, 2006) 24 B. Irrigation System 25 26 1. Winterization and Procedure 27 2. Spring Start-up and Procedure 28 3. Cross-Connection Control Device - Annual Testing and Inspection for 29 Complete Operation 30 31 8-02.3(17).SA1.DOCX 32 (******) 33 Add the following new section: 34 35 8-02.3(17) Park Restoration 36 The Contractor shall restore areas of Edgewater Park used for construction staging 37 following completion of construction staging, or as directed by the Engineer. The 38 Contractor shall remove non-native material used for grading of the staging area, remove 39 the existing modular block wall, and grade the park area following removal of non-native 40 material and the modular block wall as detailed in the Plans. 41 42 All Park Restoration Work shall be done prior to vegetation restoration. 43 44 8-02.4.GR8 45 Measurement 46 47 8-02.4.INST1.GR8 48 Section 8-02.4 is supplemented with the following: 49 50