Laserfiche WebLink
Edgewater Creek Bridge Replacement November 2023 9 b. The authorized Proposal form furnished by the Contracting Agency is not 1 used or is altered; 2 c. The completed Proposal form contains any unauthorized additions, deletions, 3 alternate Bids, or conditions; 4 d. The Bidder adds provisions reserving the right to reject or accept the award, 5 or enter into the Contract; 6 e. A price per unit cannot be determined from the Bid Proposal; 7 f. The Proposal form is not properly executed; 8 g. The Bidder fails to submit or properly complete a subcontractor list (WSDOT 9 Form 271-015), if applicable, as required in Section 1-02.6; 10 h. The Bidder fails to submit or properly complete a Disadvantaged Business 11 Enterprise Certification (WSDOT Form 272-056), if applicable, as required in 12 Section 1-02.6; 13 i. The Bidder fails to submit Written Confirmations (WSDOT Form 422-031) 14 from each DBE firm listed on the Bidder’s completed DBE Utilization 15 Certification that they are in agreement with the bidder’s DBE participation 16 commitment, if applicable, as required in Section 1-02.6, or if the written 17 confirmation that is submitted fails to meet the requirements of the Special 18 Provisions; 19 j. The Bidder fails to submit DBE Good Faith Effort documentation, if applicable, 20 as required in Section 1-02.6, or if the documentation that is submitted fails to 21 demonstrate that a Good Faith Effort to meet the Condition of Award was 22 made; 23 k. The Bidder fails to submit a DBE Bid Item Breakdown (WSDOT Form 272-24 054), if applicable, as required in Section 1-02.6, or if the documentation that 25 is submitted fails to meet the requirements of the Special Provisions; 26 l. The Bidder fails to submit DBE Trucking Credit Forms (WSDOT Form 272-27 058), if applicable, as required in Section 1-02.6, or if the documentation that 28 is submitted fails to meet the requirements of the Special Provisions; 29 m. The Bid Proposal does not constitute a definite and unqualified offer to meet 30 the material terms of the Bid invitation; or 31 n. More than one Proposal is submitted for the same project from a Bidder 32 under the same or different names. 33 34 2. A Proposal may be considered irregular and may be rejected if: 35 a. The Proposal does not include a unit price for every Bid item; 36 b. Any of the unit prices are excessively unbalanced (either above or below the 37 amount of a reasonable Bid) to the potential detriment of the Contracting 38 Agency; 39 c. Receipt of Addenda is not acknowledged; 40 d. A member of a joint venture or partnership and the joint venture or 41 partnership submit Proposals for the same project (in such an instance, both 42 Bids may be rejected); or 43 e. If Proposal form entries are not made in ink. 44 45 COE 1-02.14.DOCX 46 1-02.14 Disqualification of Bidders 47 (November 1, 2021 City of Everett GSP) 48 49 Revise this section to read: 50 51