My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 13 5. Standard Specifications, 1 6. Contracting Agency’s Standard Plans or Details (if any), and 2 7. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. 3 4 1-05.GR1 5 Control of Work 6 7 1-05.4.GR1 8 Conformity with and Deviations from Plans and Stakes 9 10 1-05.4.INST1.GR1 11 Section 1-05.4 is supplemented with the following: 12 13 1-05.4.OPT1.GR1 14 (February 6, 2023) 15 Contractor Surveying - Structure 16 The Contracting Agency has provided primary survey control in the Plans. 17 18 The Contractor shall be responsible for setting, maintaining, and resetting all alignment 19 stakes, slope stakes, and grades necessary for the construction of bridges, noise walls, 20 retaining walls, buried structures, and marine structures. Except for the survey control 21 data to be furnished by the Contracting Agency, calculations, surveying, and measuring 22 required for setting and maintaining the necessary lines and grades shall be the 23 Contractor's responsibility. 24 25 The Contractor shall inform the Engineer when monuments are discovered that were not 26 identified in the Plans and construction activity may disturb or damage the monuments. 27 All monuments noted on the plans “DO NOT DISTURB” shall be protected throughout the 28 length of the project or be replaced at the Contractor’s expense. 29 30 Detailed survey records shall be maintained, including a description of the work 31 performed on each shift, the methods utilized, and the control points used. The record 32 shall be adequate to allow the survey to be reproduced. A copy of each day's record shall 33 be provided to the Engineer within three working days after the end of the shift. 34 35 The meaning of words and terms used in this provision shall be as listed in "Definitions of 36 Surveying and Associated Terms" current edition, published by the American Congress 37 on Surveying and Mapping and the American Society of Civil Engineers. 38 39 The survey work by the Contractor shall include but not be limited to the following: 40 41 1. Verify the primary horizontal and vertical control furnished by the Contracting 42 Agency and expand into secondary control by adding stakes and hubs as well 43 as additional survey control needed for the project. Provide descriptions of 44 secondary control to the Contracting Agency. The description shall include 45 coordinates and elevations of all secondary control points. 46 47 2. Establish, by placing hubs and/or marked stakes, the location with offsets of 48 foundation shafts and piles. 49 50 3. Establish offsets to footing centerline of bearing for structure excavation. 51
The URL can be used to link to this page
Your browser does not support the video tag.