My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 14 1 4. Establish offsets to footing centerline of bearing for footing forms. 2 3 5. Establish wing wall, retaining wall, noise wall, and buried structure horizontal 4 alignment. 5 6 6. Establish retaining wall top of wall profile grade. 7 8 7. Establish buried structure profile grade. 9 10 8. Establish elevation benchmarks for all substructure formwork. 11 12 9. Check elevations at top of footing concrete line inside footing formwork 13 immediately prior to concrete placement. 14 15 10. Check column location and pier centerline of bearing at top of footing 16 immediately prior to concrete placement. 17 18 11. Establish location and plumbness of column forms, and monitor column 19 plumbness during concrete placement. 20 21 12. Establish pier cap and crossbeam top and bottom elevations and centerline of 22 bearing. 23 24 13. Check pier cap and crossbeam top and bottom elevations and centerline of 25 bearing prior to and during concrete placement. 26 27 14. Establish grout pad locations and elevations. 28 29 15. Establish structure bearing locations and elevations, including locations of 30 anchor bolt assemblies. 31 32 16. Establish box girder bottom slab grades and locations. 33 34 17. Establish girder and/or web wall profiles and locations. 35 36 18. Establish diaphragm locations and centerline of bearing. 37 38 19. Establish roadway slab alignment, grades and provide dimensions from top of 39 girder to top of roadway slab. Set elevations for deck paving machine rails. 40 41 20. Establish traffic barrier and curb profile. 42 43 21. Profile all girders prior to the placement of any deadload or construction live load 44 that may affect the girder's profile. 45 46 22. Establish locations for marine structures including fixed and floating berthing 47 structures, vehicle and pedestrian foundations and spans, and marine-based 48 buildings. 49 50 The Contractor shall provide the Contracting Agency copies of any calculations and 51 staking data when requested by the Engineer. 52
The URL can be used to link to this page
Your browser does not support the video tag.