My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 34 Removal and disposal of biological and physical hazards; removal of individuals 1 and encampments; removal, storage, and return of personal property; disposal 2 of unclaimed personal property; additional site assessment, notifications, worker 3 training and personal protective equipment required after the initial site cleanup 4 is completed; and site preservation Work authorized by the Engineer will be paid 5 for by force account in accordance with Section 1-09.6. 6 7 For the purpose of providing a common proposal for all bidders, the Contracting 8 Agency has entered an amount for the item “FA-Site Cleanup of Bio. And 9 Physical Hazards” in the bid proposal to become a part of the total bid by the 10 Contractor. 11 12 1-07.5.GR1 13 Environmental Regulations 14 15 1-07.5.INST1.GR1 16 Section 1-07.5 is supplemented with the following: 17 18 1-07.5.OPT1.GR1 19 (September 20, 2010) 20 Environmental Commitments 21 The following Provisions summarize the requirements, in addition to those required 22 elsewhere in the Contract, imposed upon the Contracting Agency by the various 23 documents referenced in the Special Provision Permits and Licenses. Throughout the 24 work, the Contractor shall comply with the following requirements: 25 26 1-07.5.OPT2.GR1 27 (August 3, 2009) 28 Payment 29 All costs to comply with this special provision for the environmental commitments and 30 requirements are incidental to the contract and are the responsibility of the Contractor. 31 The Contractor shall include all related costs in the associated bid prices of the contract. 32 33 1-07.6.GR1 34 Permits and Licenses 35 36 1-07.6.INST1.GR1 37 Section 1-07.6 is supplemented with the following: 38 39 1-07.6.OPT1.FR1.DOCX 40 (January 2, 2018) 41 The Contracting Agency has obtained the below-listed permit(s) for this project. A copy of 42 the permit(s) is attached as an appendix for informational purposes. Copies of these 43 permits, including a copy of the Transfer of Coverage form, when applicable, are required 44 to be onsite at all times. 45 46 Contact with the permitting agencies, concerning the below-listed permit(s), shall be 47 made through the Engineer with the exception of when the Construction Stormwater 48 General Permit coverage is transferred to the Contractor, direct communication with the 49 Department of Ecology is allowed. The Contractor shall be responsible for obtaining 50 Ecology’s approval for any Work requiring additional approvals (e.g. Request for 51 Chemical Treatment Form). The Contractor shall obtain additional permits as necessary. 52
The URL can be used to link to this page
Your browser does not support the video tag.