My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 35 All costs to obtain and comply with additional permits shall be included in the applicable 1 Bid items for the Work involved. 2 3 *** 4 • Everett SEPA MDNS, File #REVII21-026 5 • NEPA CE, Federal Aid Number 2776(009) 6 • Washington State Department of Ecology Shoreline Permit 7 • City of Mukilteo Engineering Permit 8 • Washington State Department of Fish and Wildlife (WDFW) Hydraulic Permit 9 Approval (HPA) 10 *** 11 12 1-07.7.GR1 13 Load Limits 14 15 1-07.7.INST1.GR1 16 Section 1-07.7 is supplemented with the following: 17 18 1-07.7.OPT6.GR1 19 (March 13, 1995) 20 If the sources of materials provided by the Contractor necessitates hauling over roads 21 other than State Highways, the Contractor shall, at the Contractor's expense, make all 22 arrangements for the use of the haul routes. 23 24 1-07.9.GR1 25 Wages 26 27 1-07.9(1).GR1 28 General 29 30 1-07.9(1).INST1.GR1 31 Section 1-07.9(1) is supplemented with the following: 32 33 1-07.9(1).OPT1.GR1 34 (January 9, 2023) 35 The Federal wage rates incorporated in this contract have been established by the 36 Secretary of Labor under United States Department of Labor General Decision No. 37 WA20230001. 38 39 The State rates incorporated in this contract are applicable to all construction 40 activities associated with this contract. 41 42 1-07.9(5)A.RTF 43 1-07.9(5)A Required Documents 44 (December 30, 2022 APWA GSP) 45 46 This section is revised to read as follows: 47 48 All Statements of Intent to Pay Prevailing Wages, Affidavits of Wages Paid and Certified 49 Payrolls, including a signed Statement of Compliance for Federal-aid projects, shall be 50 submitted to the Engineer and to the State L&I online Prevailing Wage Intent & Affidavit 51 (PWIA) system. 52
The URL can be used to link to this page
Your browser does not support the video tag.