My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 69 of pollutants, including costs and expenses incurred in the investigation, defense, or 1 settlement of claims, arising out of any one or more of the following: 2 1. Contractor’s operations related to this project. 3 2. Remediation, abatement, repair, maintenance or other work with lead-based paint or 4 materials containing asbestos. 5 3. Transportation of hazardous materials away from any site related to this project. 6 7 All entities listed under 1-07.18(2) of these Special Provisions shall be named by 8 endorsement as additional insureds on the Contractors Pollution Liability insurance policy. 9 10 Such Pollution Liability policy shall provide the following minimum limits: 11 *** $2,000,000 *** each loss and annual aggregate 12 13 1-07.23.GR1 14 Public Convenience and Safety 15 16 1-07.23(1).GR1 17 Construction Under Traffic 18 19 1-07.23(1).INST1.GR1 20 Section 1-07.23(1) is supplemented with the following: 21 22 1-07.23(1).OPT1.DOCX 23 (******) 24 1. The Contractor shall notify both the City of Everett and the City of Mukilteo’s 25 Fire, Police, Public Works Departments, and the Engineer five (5) business days 26 for arterials and three (3) business days for local roads before full closure of 27 roads and shall be limited to the roads shown in the plans. The Contractor must 28 also provide the above contacts notification upon reopening of each road no 29 later than 7:00 PM of the day the road opens. Contacts are as follows: 30 Everett Police - Non-Emergency: Robert Edmonds, Sargent 425.357.7520 31 redmonds@everettwa.gov 32 Everett Fire – Non-Emergency: Roger Vares, Division Chief 425.257.7959 33 rvares@everettwa.gov 34 Everett Public Works – 425-257-8821 35 Mukilteo Police – Non-Emergency: Glen Koen, Assistant Chief of Police 36 425.330.1537 gkoen@mukilteowa.gov 37 Mukilteo Fire – Non-Emergency: Chris Alexander, Fire Chief 425.263.8151 38 calexander@mukilteowa.gov 39 Mukilteo Public Works: Matt Nienhuis – 425-263-8171 40 41 2. The Contractor shall provide advanced notification to abutting property owners 42 and tenants of impending access restrictions. Advanced notification must be at 43 least 3 Business Days for residential property and 3 business days for 44 commercial property. 45 46 3. For work resulting in Community Transit removing any transit facility structure 47 including, but not limited to shelters, boards/kiosks and bus stop signs, fifteen 48 (15) Business Days advance notification is required. 49 Contact Rob McFarlane 425-257-7765 50 51
The URL can be used to link to this page
Your browser does not support the video tag.