My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 75 each property disturbed or otherwise interfered with by reasons of construction pursued 1 under this contract. The statement shall be signed by the private property owner, or 2 proper authority acting for the owner of the private property affected, stating that 3 permission has been granted to use the property and all necessary permits have been 4 obtained or, in the case of a release, that the restoration of the property has been 5 satisfactorily accomplished. The statement shall include the parcel number, address, 6 and date of signature. Written releases must be filed with the Engineer before the 7 Completion Date will be established. 8 9 1-08.GR1 10 Prosecution and Progress 11 12 1-08.0.RTF 13 1-08 PROSECUTION AND PROGRESS 14 15 Add the following new section: 16 17 1-08.0 Preliminary Matters 18 (May 25, 2006 APWA GSP) 19 20 1-08.0(1).RTF 21 Add the following new section: 22 23 1-08.0(1) Preconstruction Conference 24 (October 10, 2008 APWA GSP) 25 26 Prior to the Contractor beginning the work, a preconstruction conference will be held 27 between the Contractor, the Engineer and such other interested parties as may be 28 invited. The purpose of the preconstruction conference will be: 29 1. To review the initial progress schedule; 30 2. To establish a working understanding among the various parties associated or 31 affected by the work; 32 3. To establish and review procedures for progress payment, notifications, approvals, 33 submittals, etc.; 34 4. To establish normal working hours for the work; 35 5. To review safety standards and traffic control; and 36 6. To discuss such other related items as may be pertinent to the work. 37 38 The Contractor shall prepare and submit at the preconstruction conference the following: 39 1. A breakdown of all lump sum items; 40 2. A preliminary schedule of working drawing submittals; and 41 3. A list of material sources for approval if applicable. 42 43
The URL can be used to link to this page
Your browser does not support the video tag.