My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 79 as unworkable The statement will be identified as a Written Determination by the 1 Engineer. If the Contractor does not agree with the Written Determination of working 2 days, the Contractor shall pursue the protest procedures in accordance with Section 1-3 04.5. By failing to follow the procedures of Section 1-04.5, the Contractor shall be 4 deemed as having accepted the statement as correct. If the Contractor is approved to 5 work 10 hours a day and 4 days a week (a 4-10 schedule) and the fifth day of the week 6 in which a 4-10 shift is worked would ordinarily be charged as a working day then the 7 fifth day of that week will be charged as a working day whether or not the Contractor 8 works on that day. 9 10 Revise the sixth paragraph to read: 11 12 The Engineer will give the Contractor written notice of the completion date of the contract 13 after all the Contractor’s obligations under the contract have been performed by the 14 Contractor. The following events must occur before the Completion Date can be 15 established: 16 1. The physical work on the project must be complete; and 17 2. The Contractor must furnish all documentation required by the contract and required 18 by law, to allow the Contracting Agency to process final acceptance of the contract. 19 The following documents must be received by the Project Engineer prior to 20 establishing a completion date: 21 a. Certified Payrolls (per Section 1-07.9(5)). 22 b. Material Acceptance Certification Documents 23 c. Monthly Reports of Amounts Credited as DBE Participation, as required by the 24 Contract Provisions. 25 d. Final Contract Voucher Certification 26 e. Copies of the approved “Affidavit of Prevailing Wages Paid” for the Contractor 27 and all Subcontractors 28 f. A copy of the Notice of Termination sent to the Washington State Department of 29 Ecology (Ecology); the elapse of 30 calendar days from the date of receipt of the 30 Notice of Termination by Ecology; and no rejection of the Notice of Termination 31 by Ecology. This requirement will not apply if the Construction Stormwater 32 General Permit is transferred back to the Contracting Agency in accordance with 33 Section 8-01.3(16). 34 g. Property owner releases per Section 1-07.24 35 36 1-08.5.OptionB.RTF.DOCX 37 1-08.5 Time for Completion 38 (December 30, 2022 APWA GSP, Option B) 39 40 Revise the third and fourth paragraphs to read: 41 42 Contract time shall begin on the first working day following the seventh calendar day 43 after the Notice to Proceed date. If the Contractor starts work on the project at an earlier 44 date, then contract time shall begin on the first working day when onsite work begins. 45 46 Each working day shall be charged to the contract as it occurs, until the contract work is 47 physically complete. If substantial completion has been granted and all the authorized 48 working days have been used, charging of working days will cease. Each week the 49 Engineer will provide the Contractor a statement that shows the number of working days: 50
The URL can be used to link to this page
Your browser does not support the video tag.