My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 78 1-08.4.RTF 1 1-08.4 Prosecution of Work 2 3 Delete this section and replace it with the following: 4 5 1-08.4 Notice to Proceed and Prosecution of Work 6 (July 23, 2015 APWA GSP) 7 8 Notice to Proceed will be given after the contract has been executed and the contract 9 bond and evidence of insurance have been approved and filed by the Contracting 10 Agency. The Contractor shall not commence with the work until the Notice to Proceed 11 has been given by the Engineer. The Contractor shall commence construction activities 12 on the project site within ten days of the Notice to Proceed Date, unless otherwise 13 approved in writing. The Contractor shall diligently pursue the work to the physical 14 completion date within the time specified in the contract. Voluntary shutdown or slowing 15 of operations by the Contractor shall not relieve the Contractor of the responsibility to 16 complete the work within the time(s) specified in the contract. 17 18 When shown in the Plans, the first order of work shall be the installation of high visibility 19 fencing to delineate all areas for protection or restoration, as described in the Contract. 20 Installation of high visibility fencing adjacent to the roadway shall occur after the 21 placement of all necessary signs and traffic control devices in accordance with 1-10.1(2). 22 Upon construction of the fencing, the Contractor shall request the Engineer to inspect the 23 fence. No other work shall be performed on the site until the Contracting Agency has 24 accepted the installation of high visibility fencing, as described in the Contract. 25 26 1-08.5.GR1 27 Time for Completion 28 29 1-08.5.INST2.GR1 30 Section 1-08.5 is supplemented with the following: 31 32 1-08.5.OPT7.FR1.DOCX 33 (March 13, 1995) 34 This project shall be physically completed within *** 310 *** working days. 35 36 1-08.5.OptionA.RTF 37 1-08.5 Time for Completion 38 (December 30, 2022 APWA GSP, Option A) 39 40 41 Revise the third and fourth paragraphs to read: 42 43 Contract time shall begin on the first working day following the Notice to Proceed Date. 44 45 Each working day shall be charged to the contract as it occurs, until the contract work is 46 physically complete. If substantial completion has been granted and all the authorized 47 working days have been used, charging of working days will cease. Each week the 48 Engineer will provide the Contractor a statement that shows the number of working days: 49 (1) charged to the contract the week before; (2) specified for the physical completion of 50 the contract; and (3) remaining for the physical completion of the contract. The statement 51 will also show the nonworking days and all partial or whole days the Engineer declares 52
The URL can be used to link to this page
Your browser does not support the video tag.