Laserfiche WebLink
Edgewater Creek Bridge Replacement November 2023 87 1-10.5(2).OPT7.GR1 1 (November 2, 2022) 2 “Work Zone Safety Contingency”, by force account. 3 4 All costs as authorized by the Engineer will be paid for by force account as specified 5 in Section 1-09.6. 6 7 For purpose of providing a common proposal for all bidders, the Contracting Agency 8 has entered an amount for the item “Work Zone Safety Contingency” in the Proposal 9 to become a part of the Contractor’s total bid. 10 11 The Engineer may choose to use existing bid items for the implementation of the 12 agreed upon enhancement. 13 14