Laserfiche WebLink
Edgewater Creek Bridge Replacement November 2023 88 DIVISION2.GR2 1 Division 2 2 Earthwork 3 4 2-01.GR2 5 Clearing, Grubbing, and Roadside Cleanup 6 7 2-01.3.GR2 8 Construction Requirements 9 10 2-01.3.INST1.DOCX 11 Section 2-01.3 is supplemented with the following: 12 13 2-01.3.OPT1.DOCX 14 (******) 15 Tree Removal, Salvage, Stockpile, and Placement in Vegetation 16 Restoration Area 17 Trees identified for removal shall be completely removed, including the roots. The 18 Contractor shall salvage and stockpile logs 12 inches in diameter and greater and 10 feet 19 minimum in length for use and installation as down logs in the vegetation restoration areas 20 after bridge construction as detailed herein or as directed by the Engineer. 21 22 Salvaged and stockpiled log lengths of 10 feet minimum shall be placed and disbursed 23 parallel to slope contours in vegetation restoration native planting areas as shown on the 24 Plans at the time of site restoration prior to planting and installing mulch. Ivy shall be 25 removed from the logs prior to placement. Branches from salvaged trees may be chipped 26 and stockpiled for use as mulch for vegetation restoration. 27 28 2-01.4.DOCX 29 Measurement 30 31 2-01.4.INST1.DOCX 32 Section 2-01.4 is supplemented with the following: 33 34 2-01.4.OPT1.DOCX 35 (******) 36 Removed trees , salvaged, stockpiled, and placed trees and logs 12-inch diameter or 37 greater (measured at a height of 48 inches or greater above existing graded) will be 38 measured per each. No separate measurement will be made for chipped and stockpiled 39 branches. 40 41 2-01.5.GR2 42 Payment 43 44 2-01.5.INST2.DOCX 45 Section 2-01.5 is supplemented with the following: 46 47