Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 1/11/2023 1/11/2023 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> 1/9/2023 1:57 PM Asfaw Belay <br /> Contact Name:Asfaw Belay <br /> Site Address:5101 BEAUMONT DR <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> -Install mid story guides/supports on all ABS and pex pipe per the UPC chap 3 TABLE 313.3-Install cleanout on downstairs washing machine drain per <br /> the UPC chap 7 707.4 Location-Support horizontal ABS DWV every 4'per the UPC TABLE 313.3-Support pex every 32"on the horizontal per the UPC <br /> appendix 17.2 Horizontal Tubing on the vertical per 7.1 Vertical Support-Install cleanout off kitchen drain in basement per chap 7 707.4 Location-Vent <br /> for downstairs dual lav and kitchen cannot tie into upstairs shower vent below the flood level must tie in above the flood level at least 6"per the UPC <br /> 905.3 Vent Pipe Rise-Shower vent is back-graded grade at 1/4"per foot per the UPC 905.1 Grade-Use approved drainage fitting for DWV per chap 7 <br /> and 9 of the UPC for vertical to horizontal and horizontal to horizontal.-Test entire ABS DWV from below slab through the roof vents per chap 7 UPC <br /> 712.2 Water Test**** For rough approval an onsite camera scoping of all the newly installed,(previously not inspected),drain waste and vent piping <br /> under the slab,will be required in lieu of removing concrete to ensure code approved slope and fittings.Per the UPC 105.1 General <br /> 1/31/2023 1/31/2023 T <br /> UMB 03-ROUGH JASON NOT READY eTRAKiT Inspection Request <br /> IN MORRISSEY <br /> Notes: <br /> 1/27/2023 2:40 PM Asfaw Belay <br /> Contact Name:Asfaw Belay <br /> Site Address:5101 BEAUMONT DR <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> 2/1/2023 2/1/2023 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> 1/31/2023 9:59 AM Asfaw Belay <br /> Contact Name:Asfaw Belay <br /> Site Address:5101 BEAUMONT DR <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> -Replace vent 90 with long turn 90 on 11/2"main floor shower vent per 2018 UPC 905.3 Vent Pipe Rise.*** Make sure to have all piping supported per <br /> previous correction and then fill waste and vent system through the roof. <br /> 2/9/2023 2/9/2023 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> 2/7/2023 4:24 PM Asfaw Belay <br /> Contact Name:Asfaw Belay <br /> Site Address:5101 BEAUMONT DR <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> -Put waste on test through roof vents per the UPC chapter 7 water test.-Replace firnco coupling on upstairs vent transition with approved shielded <br /> mission coupling per the UPC.-Upsize vent intersection of two 2"vents to at least 3"to satisfy cross sectional area requirements set forth in chap 9 of <br /> the UPC.-Missing nail plates downstairs kitchen drain and DWV top plates laundry/bathroom downstairs. <br /> I <br /> Printed:Thursday,22 June,2023 3 of 5 rk <br /> SUPERION <br />