Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 2/13/2023 2/13/2023 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> 2/11/2023 2:02 PM Asfaw Belay <br /> Contact Name:Asfaw Belay <br /> Site Address:5101 BEAUMONT DR <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> -Leak on cast iron to galvanized vent connection.-Replace firnco couplings with shielded mission coupling per the UPC. <br /> 2/14/2023 2/14/2023 PLUMB 03-ROUGH JASON PARTIAL see notes <br /> IN MORRISSEY APPROVAL <br /> Notes: <br /> 2/13/2023 1:39 PM Asfaw Belay <br /> Contact Name:Asfaw Belay <br /> Site Address:5101 BEAUMONT DR <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> DWV and water piping above base to floor ok.*** Need to have a camera inspection for under slab DWV for full rough approval. <br /> DWV and water piping above base to floor ok.*** Need to have a camera inspection for under slab DWV for full rough approval. <br /> 2/16/2023 2/16/2023 PLUMB 03-ROUGH JASON APPROVAL see notes <br /> IN MORRISSEY <br /> Notes: <br /> 2/15/2023 1:34 PM Asfaw Belay <br /> Contact Name:Asfaw Belay <br /> Site Address:5101 BEAUMONT DR <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> -Under slab DWV appears to be in compliance with code via camera inspection.Camera shows root instruction in existing portion of cast iron pipe <br /> leaving through foundation. Informed owner repair of this pipe will require an additional permit and inspection or inspection on existing plumbing <br /> permit. <br /> 6/16/2023 6/16/2023 PLUMB 08-FINAL JASON CORRECTION see notes <br /> MORRISSEY REQUIRED <br /> Notes: <br /> 6/14/2023 6:07 PM Asfaw Belay <br /> Contact Name:Asfaw Belay <br /> Site Address:5101 BEAUMONT DR <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> -Caulk all toilets and shower escutcheon's to adjoining surfaces per the UPC 402.2 Joints-No hot water to fixtures.Tank was not turned on.-Leak under <br /> downstairs kitchen sink and air-gap hoses are installed backwards from dishwasher drain to disposal.-Leak at brass nipple connection to pressure relief <br /> valve when valve is opened.-Support expansion tank with plumbers tape.-Install foam pad and drain pan with leak detection device under water heater <br /> per the UPC.-Install inline hammer arresters on supplies to both dishwashers per the UPC 609.10 Water Hammer-Upstairs dishwasher air gap is <br /> plumbed backwards as well.Install per manufacturer instructions.**** Building water supply systems where quick-acting valves are installed shall be <br /> provided with water hammer arrester(s)to absorb high pressures resulting from the quick closing of these valves.Water hammer arresters shall be <br /> I <br /> Printed:Thursday,22 June,2023 4 of 5 rk <br /> SUPERION <br />