IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Time shall be adjusted as the parties agree. If the parties cannot agree, the Owner's <br />Representative will determine the adjustment of Contract Time. <br />Acceptable materials ordered by the Contractor prior to the date the Work was terminated or deleted will <br />either be purchased from the Contractor by the Owner at the actual cost and shall become the property of <br />the Owner, or the Owner will reimburse the Contractor for the actual costs of returning these materials to <br />the Suppliers. <br />If Contractor disagrees with the adjustment of Contract Sum determined by the Owner's Representative, <br />Contractor may submit a Contract Claim for the difference between the amount determined by the <br />Owner's Representative and the amount sought by the Contractor. <br />Contractor shall not be entitled to anticipated profits on deleted, terminated, or uncompleted Work. <br />9.3. CHARGES TO CONTRACTOR <br />The Contractor shall pay the Owner on demand everything charged to it under the terms of this Contract. <br />Such charges may be deducted by the Owner from money due or to become due to the Contractor under <br />the Contract. The Owner may recover such charges from the Contractor or from its surety. <br />Contractor agrees to pay the costs of overtime or excessive inspection and observation costs incurred by <br />the Owner. Overtime inspection shall include inspection required during Saturdays, Sundays, City <br />holidays and weekdays, in excess of 40 hours per week or outside of normal working hours and <br />inspections or observations that result in an inspector or observer working more than forty hours in a <br />week. Costs of such overtime or excessive inspection or observation include architecture, engineering, <br />construction management services, inspection, general supervision and Overhead expenses which are <br />directly chargeable to the overtime or excessive work. Contractor agrees that Owner will deduct such <br />charges from payments due the Contractor. In the event the Owner by Change Order requires the <br />Contractor to work in excess of the established schedule of working hours, the Owner will not charge the <br />Contractor for inspection costs associated therewith. <br />9.4. COMPENSATION TO OWNER FOR TIME EXTENSION <br />The Owner shall be compensated by the Contractor for the actual costs to the Owner of engineering, <br />inspection, general supervision, right-of-way costs, permit fees, Overhead expenses, and any other <br />ascertainable direct costs to the Owner that are directly chargeable to the Work and which accrue during <br />the period of such extension. The actual costs do not include charges for final inspection and preparation <br />of the final payment by the Owner. <br />9.5. ADJUSTMENT OF CONTRACT SUM <br />9.5.1 Calculation <br />Except as otherwise expressly provided in these General Conditions, any and all adjustments of Contract <br />Sum shall be determined as follows: <br />1. If the parties are able to agree, the price will be determined by using: <br />a. Unit prices, if the Work items are defined by unit prices; and <br />b. Other prices agreed upon by the Contractor and Owner for Work not defined by unit prices. <br />2. If the parties cannot agree, the Owner's Representative will determine the price pursuant to the <br />following order: <br />a. Unit prices, if the Work items are defined by unit prices; and <br />b. Other means to establish the reasonable cost of the Work if it is not defined by unit prices, <br />including, but not limited to, Force Account as described in 9.6. FORCE ACCOUNT, the <br />Schedule of Values, or estimating manuals. <br />9.5.2 Limitations <br />The following limitations shall apply in determining the amount of an adjustment: <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />