IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1. Except as otherwise expressly provided, Contractor will only be paid for costs it clearly and <br />convincingly proves it actually and directly incurred, and shall not include consequential or indirect <br />damages not otherwise expressly permitted by the Contract Documents. Costs and damages for <br />which Owner shall not be liable under any circumstances include, but are not limited to: (a) <br />borrowing or interest costs, charges, or expenses of Contractor; (b) alleged lost profit or Overhead <br />on any other project; and (c) Contractor's failure or inability to obtain other work. <br />2. No Contract Claim for adjustment of Contract Sum or additional compensation for extra, affected, <br />impacted or inefficient Work will be allowed where the Contractor does not keep and maintain <br />contemporaneous, complete and accurate time records for labor and equipment and <br />contemporaneous, complete and accurate records for materials and where such records do not <br />contemporaneously segregate and allocate by time, location and work the time and costs for each <br />item or element of such work. Contractor's failure to keep and maintain such records constitutes a <br />waiver of any Contract Claim or request by the Contractor for adjustment of Contract Sum for such <br />costs or event. <br />3. To the extent the Contractor is entitled to an adjustment of Contract Sum due to any Delay or <br />extension of Contract Time, Contractor shall be compensated as provided in 12.4 REMEDIES. <br />Such compensation shall be full, adequate and complete compensation for all direct, indirect, <br />cumulative, inefficiency, impact and ripple costs causing, arising out of, or relating to such delays <br />or extension. <br />4. Contractor and Owner agree that compensation to the Contractor for a Contract Claim shall not <br />exceed the Contractor's actual costs based upon Force Account as described in 9.6. FORCE <br />ACCOUNT. Contractor waives, releases, and agrees not to submit any request for adjustment of <br />Contract Sum or Contract Claim based upon a "total cost" or "modified total cost" calculation, in <br />whole or in part, but instead agrees that any and all requests for compensation shall be based upon <br />accurate, complete and contemporaneous cost records that segregate and allocate actual costs (a) <br />between base Contract Work and the work for which additional compensation is sought and (b) <br />between each item of work for which additional compensation is sought. Claims for inefficiency <br />shall only be based on and calculated by a comparison of productivity of similar Work performed in <br />an unaffected or least affected area of the Project. <br />5. No claim for consequential damages of any kind will be allowed. <br />9.5.3 Unabsorbed and Extended Overhead <br />Any Extended or Unabsorbed Overhead to which the Contractor may be entitled shall be calculated using <br />the Eichleay formula by: <br />1. Determining the pro-rata amount of Overhead allocable to the subject project. This is <br />accomplished by multiplying Overhead costs by the ratio of the subject project's billings to the <br />Contractor's overall billings during the overall period of the subject Project's performance. The <br />result is "Allocable Overhead." <br />a. Any additional and unresolved direct cost claims presented by the Contractor concurrently <br />with any request for Extended and/or Unabsorbed Overhead shall not be included in <br />determining the ratio of the subject Project billings to overall Contractor billings for the <br />period of project performance. <br />2. Determining the daily amount of Allocable Overhead for the subject Project. This is <br />accomplished by dividing the Allocable Overhead for the subject Project by the number of days <br />(as contractually defined) of Contract performance. The result is the Daily Rate of Allocable <br />Overhead. <br />3. Determining the gross amount of potential additional compensation for Home Office Overhead <br />due to the project extension. This is accomplished by multiplying the Daily Rate of Allocable <br />Overhead by the number of days of project extension caused solely by the Owner. This results in <br />the Gross Amount of Additional Home Office Overhead Compensation. <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />