Laserfiche WebLink
03 30 20 - HOT WEATHER CONCRETING PROCEDURES <br />03 31 00 - STRUCTURAL CONCRETE <br />03 60 00 - GROUTING <br />03 64 00 - INJECTABLE HOSE INSTALLATION PROCEDURE <br />03 64 23.10 - EPDXY ADHESIVE INJECTION OF CONCRETE (PRESTRESS TANKS) <br />DIVISION 05 — METALS <br />05 50 00 - METAL FABRICATIONS <br />DIVISION 09 — FINISHES <br />09 90 00 - PAINTING AND COATING <br />DIVISION 10 — SPECIALTIES <br />10 14 00 - IDENTIFICATION DEVICES <br />DIVISION 11 — EQUIPMENT <br />11 95 00 - STORAGE TANK HYDRODYNAMIC MIXING SYSTEM <br />DIVISION 26 — ELECTRICAL <br />26 05 00 - ELECTRICAL - BASIC REQUIREMENTS <br />26 05 19 - WIRE AND CABLE - 600 VOLT AND BELOW <br />26 05 26 - GROUNDING AND BONDING <br />26 05 33 - RACEWAYS AND BOXES <br />26 05 48 - ELECTRICAL SEISMIC RESTRAINT SYSTEMS.docx <br />26 08 13 - ACCEPTANCE TESTING <br />26 09 13 - ELECTRICAL METERING DEVICES <br />26 22 13 - DRY -TYPE TRANSFORMERS <br />26 24 13 - SWITCHBOARDS <br />26 24 16 - PANELBOARDS <br />26 27 26 - WIRING DEVICES <br />26 28 00 - OVERCURRENT AND SHORT CIRCUIT PROTECTIVE DEVICES <br />26 28 16 - SAFETY SWITCHES <br />26 32 14 - ENGINE GENERATOR - DIESEL <br />26 32 90 - GENERATOR LOAD BANK CONNECTION CABINET <br />26 36 00 - TRANSFER SWITCHES <br />26 42 13 - GALVANIC ANODE CATHODIC PROTECTION <br />26 43 13 - SURGE PROTECTION DEVICES FOR LOW -VOLTAGE ELECTRICAL POWER <br />CIRCUITS <br />26 50 00 - INTERIOR AND EXTERIOR LIGHTING <br />DIVISION 27 — COMMUNICATIONS <br />27 50 00 - INSTRUMENTATION AND CONTROLS <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 SP - ii <br />TABLE OF CONTENTS March 2024 <br />