My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:19:41 AM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
VOLUME 2 OF 3 <br />DIVISION 31 THROUGH 46 AND APPENDICES <br />DIVISION 31 - EARTHWORK <br />31 05 14 - EARTHWORK <br />31 05 14 - ZONE A EARTHWORK <br />31 09 00 - GEOTECH INSTRUMENTATION AND MONITORING <br />31 10 00 - SITE CLEARING <br />31 23 19 - DEWATERING <br />31 23 24 - CONTROLLED DENSITY FLOWABLE FILL <br />31 63 26 - CONTRACTOR DESIGNED EXCAVATION SUPPORT <br />DIVISION 32 - EXTERIOR IMPROVEMENTS <br />32 12 16 - FLEXIBLE PAVEMENT <br />32 31 13 - CHAIN LINK FENCING AND GATES <br />DIVISION 33 - UTILITIES <br />33 05 13 - MANHOLES <br />33 05 17 - PRECAST VAULTS <br />33 05 31 - PVC SOLID WALL PIPE <br />33 11 10 - DUCTILE IRON WATER DISTRIBUTION SYSTEM <br />33 11 10.36 - STEEL PIPE LINED AND COATED <br />33 11 10.47 - STEEL PIPE FABRICATED SPECIALS <br />33 11 50 - EXISTING PIPE ABANDONMENT <br />33 12 16 - WATER DISTRIBUTION VALVES AND APPURTENANCES <br />33 13 00 - TESTING AND DISINFECTING OF WATER UTILITY PIPING <br />33 16 10 - PRESTRESSED CONCRETE WATER UTILITY STORAGE RESERVOIR <br />33 16 10.10 - PRESTRESSED CONCRETE WATER UTILITY RES ACCESSORIES <br />33 32 16.13 - SUMP PUMP SYSTEM <br />33 41 10 - STORM UTILITY DRAINAGE PIPING <br />DIVISION 40 - PROCESS INTERCONNECTIONS <br />40 05 13 - COMMON WORK RESULTS FOR PROCESS PIPING <br />40 05 23 - STAINLESS STEEL PROCESS PIPE AND TUBING <br />40 05 23.15 - GATE VALVES <br />40 05 23.18 - BUTTERFLY VALVES <br />40 05 23.72 - MISCELLANEOUS VALVES <br />40 05 51 - COMMON WORK RESULTS FOR PROCESS VALVES <br />40 71 13 - FULL INSERTION MAGNETIC FLOW METER <br />40 75 00 - PROCESS LIQUID ANALYTICAL MEASUREMENT <br />40 75 10 - DECHLORINATION SYSTEM <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 SP - iii <br />TABLE OF CONTENTS March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.