Laserfiche WebLink
VOLUME 2 OF 3 <br />DIVISION 31 THROUGH 46 AND APPENDICES <br />DIVISION 31 - EARTHWORK <br />31 05 14 - EARTHWORK <br />31 05 14 - ZONE A EARTHWORK <br />31 09 00 - GEOTECH INSTRUMENTATION AND MONITORING <br />31 10 00 - SITE CLEARING <br />31 23 19 - DEWATERING <br />31 23 24 - CONTROLLED DENSITY FLOWABLE FILL <br />31 63 26 - CONTRACTOR DESIGNED EXCAVATION SUPPORT <br />DIVISION 32 - EXTERIOR IMPROVEMENTS <br />32 12 16 - FLEXIBLE PAVEMENT <br />32 31 13 - CHAIN LINK FENCING AND GATES <br />DIVISION 33 - UTILITIES <br />33 05 13 - MANHOLES <br />33 05 17 - PRECAST VAULTS <br />33 05 31 - PVC SOLID WALL PIPE <br />33 11 10 - DUCTILE IRON WATER DISTRIBUTION SYSTEM <br />33 11 10.36 - STEEL PIPE LINED AND COATED <br />33 11 10.47 - STEEL PIPE FABRICATED SPECIALS <br />33 11 50 - EXISTING PIPE ABANDONMENT <br />33 12 16 - WATER DISTRIBUTION VALVES AND APPURTENANCES <br />33 13 00 - TESTING AND DISINFECTING OF WATER UTILITY PIPING <br />33 16 10 - PRESTRESSED CONCRETE WATER UTILITY STORAGE RESERVOIR <br />33 16 10.10 - PRESTRESSED CONCRETE WATER UTILITY RES ACCESSORIES <br />33 32 16.13 - SUMP PUMP SYSTEM <br />33 41 10 - STORM UTILITY DRAINAGE PIPING <br />DIVISION 40 - PROCESS INTERCONNECTIONS <br />40 05 13 - COMMON WORK RESULTS FOR PROCESS PIPING <br />40 05 23 - STAINLESS STEEL PROCESS PIPE AND TUBING <br />40 05 23.15 - GATE VALVES <br />40 05 23.18 - BUTTERFLY VALVES <br />40 05 23.72 - MISCELLANEOUS VALVES <br />40 05 51 - COMMON WORK RESULTS FOR PROCESS VALVES <br />40 71 13 - FULL INSERTION MAGNETIC FLOW METER <br />40 75 00 - PROCESS LIQUID ANALYTICAL MEASUREMENT <br />40 75 10 - DECHLORINATION SYSTEM <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 SP - iii <br />TABLE OF CONTENTS March 2024 <br />