My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
made only if such allowances are required by a regional labor agreement or are normally paid by <br />the Contractor to comparable labor for performing other work. <br />3. Industrial Insurance and Medical Aid Premiums. The Owner will reimburse Contractor -paid <br />premiums for Marine Industrial Insurance, for State of Washington Industrial Insurance, and <br />Medical Aid Premiums that become an obligation of the Contractor and are chargeable to the <br />Force Account Work. The Owner will not pay the Contractor for Medical Aid premiums that are <br />paid by the employees. <br />4. Overhead and Profit. The Owner will pay the Contractor twenty-nine (29) percent of the sum of <br />the costs listed in a, b, and c above to cover Project Overhead, general company Overhead, profit, <br />and any other costs incurred. <br />9.6.2. Materials. <br />The Owner will reimburse actual invoice cost for Contractor -supplied materials. This cost includes actual <br />freight and express charges and taxes, provided that these costs have not been paid in some other manner <br />under the Contract. A deduction will be made for any offered or available discounts or rebates if the <br />Owner has provided the Contractor with the means to comply with the provisions allowing the discount. <br />The Owner will then add twenty-one (21) percent of the balance to cover Project overhead, general <br />company Overhead, profit, and any other cost of supplying materials. <br />To support charges for materials, the Contractor shall provide the Owner's Representative with authentic, <br />complete and accurate copies of vendor invoices, including freight and express bills. If invoices are not <br />available for materials from the Contractor stocks, the Contractor shall certify actual costs by affidavit. <br />If Contract Claims for materials costs are too high, inappropriate, or unsupported by satisfactory <br />evidence, the Owner's Representative may determine the cost for all or part of the materials. When <br />determined in this manner, the cost will be the lowest current wholesale price from a source that can <br />supply the required quantity, including delivery costs. <br />The Owner reserves the right to provide materials. If so, the Contractor will receive no payment for any <br />costs, Overhead, or profit on such materials. <br />9.6.3. Equipment. <br />The equipment rates shall be actual cost but shall not exceed the rates set forth in the AGC/WSDOT <br />Equipment Rental Agreement in effect at the time the Work is performed, <br />The approval of the Owner's Representative shall be required for the selection of machine -power tools or <br />equipment prior to their use in Force Account situations. <br />The payment for any machine -power tools or equipment shall be made according to the current <br />AGC/WSDOT Equipment Rental Agreement in effect at the time the Force Account is authorized. The <br />rates as set forth in the Rental Rate Blue Book (as modified by the current AGC/WSDOT Equipment <br />Rental Agreement) are the maximum rates allowable for equipment of modern design and in good <br />working condition. These rates shall be full compensation for all fuel, oil, lubrication, repairs, <br />maintenance, and all other costs incidental to furnishing and operating the equipment except labor for <br />operation. <br />The Owner will add twenty-one (21) percent to equipment costs to cover Project Overhead, general <br />company Overhead (excluding equipment Overhead included in the Rental Rate Blue Book), and profit. <br />Current copies of the Rental Rate Blue Book and the AGC/WSDOT Equipment Rental Agreement will be <br />maintained at each region office of the Washington State Department of Transportation and at each of the <br />offices of the Associated General Contractors of America, in Seattle, Spokane, Tacoma, Washington and <br />Wilsonville, Oregon, where they are available for inspection. <br />9.6.4. For Services. <br />Compensation under Force Account for specialized services shall be made on the basis of an invoice from <br />the providing entity. A "specialized service" shall be one that is typically billed through invoice in <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.