Laserfiche WebLink
standard industry practice. Before Work is started, the Owner's Representative may require the <br />Contractor to obtain multiple quotations for the service to be utilized and select the provider with prices <br />and terms most advantageous to the Owner. In the event that prior quotations are not obtained and the <br />service invoice is submitted by the Subcontractor, then after -the -fact quotations may be obtained by the <br />Owner's Representative from the open market in the vicinity and the lowest such quotation may be used <br />in place of the submitted invoice. <br />Except as noted below, the Owner will pay the Contractor an additional twenty-one (21) percent of the <br />sum of the costs included on invoices for specialized services to cover project Overhead, general <br />company Overhead, profit, bonding, insurance, Business & Occupation tax, and other costs incurred. <br />When a Supplier of services is compensated through invoice, but acts in the manner of Subcontractor, as <br />described in 9.6.6. For Contractor Markup of Subcontractors Work of this provision, then markup for <br />that invoice shall be according to 9.6.6. For Contractor Markup of Subcontractors Work. <br />9.6.5. For Mobilization. <br />Mobilization is defined as the preparatory work performed by the Contractor including procurement, <br />loading and transportation of tools and equipment, and personal travel time, when such travel time is a <br />contractual obligation of the Contractor or a customary payment for the Contractor to all employees. <br />Mobilization also includes the costs incurred during demobilization applies to both Force Account and <br />other Contract Work. Owner will pay for mobilization for off -site preparatory work for Force Account <br />items provided that Notice has been provided sufficiently in advance to allow the Owner's Representative <br />to witness the activity, if desired. <br />Any costs experienced during mobilization activities for labor, equipment, materials or services shall be <br />listed in that section of the Mobilization and paid accordingly. <br />9.6.6. For Contractor Markup on Subcontractor's Work. <br />When Work is performed on a Force Account basis by one or more approved Subcontractors, by lower - <br />tier Subcontractors or Suppliers, or through invoice by firm(s) acting in the manner of a Subcontractor, <br />the Contractor will be allowed an additional markup, from the table below, applied to the costs computed <br />for Work done by each Subcontractor through 9.6.1, 9.6.2, 9.6.3, and 9.6.4, to compensate for all <br />administrative costs, including project Overhead, general company Overhead, profit, bonding, insurance, <br />Business & Occupation tax, and any other costs incurred. <br />A firm may be considered to be acting as a Subcontractor when the Owner's Representative observes one <br />or more of the following characteristics: <br />1. The person in charge of the firm's activities takes an active role in managing the overall project, <br />including extensive coordination, interpretation of Drawings, interaction with the Owner or <br />management of a complex and interrelated operation. <br />2. Rented equipment is provided fueled, operated and maintained by the firm. Operators of rented <br />equipment are supervised directly by the firm's representative. There is a little interaction <br />between the Contractor and the employees of the firm. <br />3. The firm appears to be holding the risk of performance and quality of the Work. <br />4. The firm appears to be responsible for liability arising from the Work. <br />Markups on Work Performed by Subcontractor(s): <br />On amounts paid for Work performed <br />by each Subcontractor on each <br />Force Account and calculated Up to $25,0000 12% <br />through 9.6.1-4 <br />On amounts greater than $25,000 up to $100,000 10% <br />On amounts greater than $100,000 7% <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />