My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
standard industry practice. Before Work is started, the Owner's Representative may require the <br />Contractor to obtain multiple quotations for the service to be utilized and select the provider with prices <br />and terms most advantageous to the Owner. In the event that prior quotations are not obtained and the <br />service invoice is submitted by the Subcontractor, then after -the -fact quotations may be obtained by the <br />Owner's Representative from the open market in the vicinity and the lowest such quotation may be used <br />in place of the submitted invoice. <br />Except as noted below, the Owner will pay the Contractor an additional twenty-one (21) percent of the <br />sum of the costs included on invoices for specialized services to cover project Overhead, general <br />company Overhead, profit, bonding, insurance, Business & Occupation tax, and other costs incurred. <br />When a Supplier of services is compensated through invoice, but acts in the manner of Subcontractor, as <br />described in 9.6.6. For Contractor Markup of Subcontractors Work of this provision, then markup for <br />that invoice shall be according to 9.6.6. For Contractor Markup of Subcontractors Work. <br />9.6.5. For Mobilization. <br />Mobilization is defined as the preparatory work performed by the Contractor including procurement, <br />loading and transportation of tools and equipment, and personal travel time, when such travel time is a <br />contractual obligation of the Contractor or a customary payment for the Contractor to all employees. <br />Mobilization also includes the costs incurred during demobilization applies to both Force Account and <br />other Contract Work. Owner will pay for mobilization for off -site preparatory work for Force Account <br />items provided that Notice has been provided sufficiently in advance to allow the Owner's Representative <br />to witness the activity, if desired. <br />Any costs experienced during mobilization activities for labor, equipment, materials or services shall be <br />listed in that section of the Mobilization and paid accordingly. <br />9.6.6. For Contractor Markup on Subcontractor's Work. <br />When Work is performed on a Force Account basis by one or more approved Subcontractors, by lower - <br />tier Subcontractors or Suppliers, or through invoice by firm(s) acting in the manner of a Subcontractor, <br />the Contractor will be allowed an additional markup, from the table below, applied to the costs computed <br />for Work done by each Subcontractor through 9.6.1, 9.6.2, 9.6.3, and 9.6.4, to compensate for all <br />administrative costs, including project Overhead, general company Overhead, profit, bonding, insurance, <br />Business & Occupation tax, and any other costs incurred. <br />A firm may be considered to be acting as a Subcontractor when the Owner's Representative observes one <br />or more of the following characteristics: <br />1. The person in charge of the firm's activities takes an active role in managing the overall project, <br />including extensive coordination, interpretation of Drawings, interaction with the Owner or <br />management of a complex and interrelated operation. <br />2. Rented equipment is provided fueled, operated and maintained by the firm. Operators of rented <br />equipment are supervised directly by the firm's representative. There is a little interaction <br />between the Contractor and the employees of the firm. <br />3. The firm appears to be holding the risk of performance and quality of the Work. <br />4. The firm appears to be responsible for liability arising from the Work. <br />Markups on Work Performed by Subcontractor(s): <br />On amounts paid for Work performed <br />by each Subcontractor on each <br />Force Account and calculated Up to $25,0000 12% <br />through 9.6.1-4 <br />On amounts greater than $25,000 up to $100,000 10% <br />On amounts greater than $100,000 7% <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.