IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
10.3 SUPPLEMENTAL INFORMATION <br />Contractor shall supplement the written Notice as soon as possible with a written statement providing the <br />following: <br />1. The date of the event, incident, direction, and other pertinent information; <br />2. The nature and circumstances giving rise to the Notice; <br />3. The Contract provisions relating to, but not limited to, the event, incident, and direction; <br />4. The estimated dollar cost, if any, of the Extra Work, or Delay, or both and how that estimate was <br />determined; and <br />5. An analysis of the schedule showing the schedule change or disruption if the Contractor is <br />asserting a schedule change or disruption. <br />Throughout any work related to a Notice, the Contractor shall keep complete and accurate records of <br />costs, expenses, and time incurred for which Contractor will or may seek an adjustment. Contractor <br />waives and is stopped from seeking an adjustment of Contract Sum or Contract Time where Contractor <br />fails to keep and maintain cost, timekeeping, and scheduling records segregated and contemporaneously <br />allocated to the subject work for which an adjustment is sought. For example, failure to keep <br />contemporaneous labor and equipment time records specifically and only allocated to each item of <br />claimed Extra Work shall constitute a waiver of any Contract Claim for reimbursement or additional <br />Contract Time for each such item of Extra Work. The Contractor shall permit the Owner access to these <br />and any other records needed for evaluating requests for additional Contract Time or Contract Sum. <br />11. DIFFERING SITE CONDITIONS <br />Upon discovery and before such conditions are disturbed, the Contractor shall promptly provide Notice to <br />the City's Representative of: <br />1. Pre-existing subsurface or latent physical conditions at the site differing materially from <br />those indicated in this Contract, or <br />2. Pre-existing unknown physical conditions at the site, of an unusual nature, differing <br />materially from those ordinarily encountered and generally recognized as inhering in <br />work of the character provided for in this Contract. <br />Upon written request, the City's Representative shall determine whether the actual conditions <br />encountered by the Contractor conditions are materially different and, if so, are the cause of a material <br />increase or decrease in the Contractor's cost of performance of the Work, or extend the duration of the <br />critical path of the schedule. Upon such determination, the City's Representative will make an adjustment <br />of Contract Sum or Contract Time, as appropriate. Extensions of Contract Time will be evaluated in <br />accordance with 5.2.2.2 Extensions of Contract Time. <br />The City's Representative's determination that differing site conditions do not exist and/or the appropriate <br />adjustment in Contract Sum or Contract Time (if any) shall be final. If there is a decrease in the cost or <br />time required to perform the Work, failure of the Contractor to notify the City's Representative of the <br />differing site condition shall not affect the City's right to make an adjustment in the Contract Sum or <br />Contract Time. Additionally, no Contract Claim or adjustment of Contract Sum or Contract Time shall <br />be allowed unless the Contractor has followed the procedures provided for in this Contract, including, but <br />not limited to, furnishing timely Notice of the event and its effect on Contract Time and Contract Sum as <br />required herein. <br />Contractor shall in no event be entitled to a Contract Claim or adjustment of Contract Sum or Contract <br />Time based on an allegation that the pre-existing subsurface or latent physical conditions at the site differ <br />materially from those indicated in this Contract unless Contractor establishes that it reasonably relied on <br />the conditions indicated in this Contract when making its bid, that the actual conditions encountered on <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />