My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
the site differed materially from those indicated in this Contract, and that such materially -different <br />conditions were not foreseeable at the time of its bid. <br />12. CONTRACT CLAIMS <br />12.1 GENERAL <br />If the Contractor requests or believes for any reason that it is entitled to an adjustment of Contract Sum or <br />Contract Time, or if the Contractor has a Dispute with the Owner and wants the Owner to take some <br />action, or refrain from taking action, the Contractor shall file a Contract Claim as provided in this section. <br />A timely and complete Contract Claim is a condition precedent to any entitlement by the Contractor to an <br />adjustment of Contract Sum or Contract Time. No Contract Claim shall be allowed unless the Contractor <br />has given Notice as required by 10. NOTICE TO OWNER and/or 11. DIFFERING SITE <br />CONDITIONS and otherwise fully complies with the requirements of this section 12. CONTRACT <br />CLAIMS. The Contractor waives any Contract Claim if: (a) Notice was not timely given in accordance <br />with the requirements of 10. NOTICE TO OWNER and/or 11. DIFFERING SITE CONDITIONS; <br />(b) the Owner's Representative is not afforded reasonable access by the Contractor to complete records, <br />including, but not limited to, correspondence, job diaries, and actual cost and additional time incurred; (c) <br />a Contract Claim is not timely filed as required by the General Conditions; or (d) adequate, accurate, <br />contemporaneous and segregated supporting time and expense records are not kept and maintained. The <br />fact that the Contractor provided proper and timely Notice, provided a properly filed Contract Claim, or <br />provided the Owner's Representative access to records of actual cost, shall not in any way be construed as <br />proving or substantiating the validity of the Contract Claim. If the Owner determines the Contract Claim <br />has merit in whole or in part, the Owner's Representative will make an adjustment of Contract Sum or <br />Contract Time required for the work, or both. If the Owner's Representative finds the Contract Claim to <br />be without merit, no adjustment will be made. <br />The Contractor shall keep full, complete, accurate and contemporaneous records of the costs and <br />additional time incurred for any alleged Contract Claim. The Contractor shall permit the Owner's <br />Representative to have access to those records and any other records as may be required by the Owner's <br />Representative to determine the facts or contentions involved in the Contract Claim. Owner is not <br />obligated to respond to a Contract Claim unless the Contractor is in full compliance with all the <br />provisions of the General Conditions and the formal Contract Claim document has been submitted. <br />Full compliance by the Contractor with the provisions of this section 12 is a contractual condition <br />precedent to the Contractor's right to sue or seek any recovery against the Owner in any legal proceeding. <br />12.2 CONTENTS <br />All Contract Claims filed by the Contractor shall be in writing, verified under penalty of perjury by an <br />officer or principal of the Contractor, and in sufficient detail to enable the Owner's Representative to <br />ascertain the basis and amount of the Contract Claim. All Contract Claims shall be submitted to the <br />Owner's Representative. At a minimum, each Contract Claim must include: <br />1. A detailed factual statement of the Contract Claim for an adjustment of the Contract Sum or <br />Contract Time, if any, providing all necessary dates, locations, and items of work affected by the <br />Contract Claim. <br />2. The dates of all facts related to the Contract Claim. <br />3. The name of each Owner's individual, official, or employee involved in or knowledgeable about <br />the Contract Claim. <br />4. The specific provisions of the Contract that support the Contract Claim and a statement of the <br />reasons why such provisions support the Contract Claim. <br />5. If the Contract Claim relates to a decision of the Owner's Representative that the Contract leaves <br />to the Owner's Representative's discretion or as to which the Contract provides that the Owner <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.