Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Representative's decision is final, the Contractor shall set out in detail all facts supporting its <br />position relating to the decision of the Owner's Representative. <br />6. Identification of any documents and the substance of any oral communications that support the <br />Contract Claim. <br />7. Copies of any identified documents that support the Contract Claim, other than Owner documents <br />and documents previously furnished to the Owner by the Contractor. Standard industry manuals <br />may be incorporated by reference. <br />8. If Contractor seeks an extension of Contract Time: <br />a. The specific amount of time (including days and dates) sought. <br />b. The specific reasons the Contractor believes an extension of Contract Time should be <br />granted, including, but not limited to, compliance with the requirements of 5.2.2.2 <br />Extensions of Contract Time; and <br />c. The specific provisions of the Contract Documents under which it is sought. <br />9. If Contractor seeks an increase in the Contract Sum, the exact amount sought and a breakdown of <br />that amount into the following categories: <br />a. Labor <br />b. Materials <br />c. Direct Equipment. The actual cost for each piece of equipment for which a Contract Claim is <br />made or in the absence of actual cost, the rates established by the AGC/WSDOT Equipment <br />Rental Agreement that was in effect when the work was performed. In no case shall the <br />amounts sought or paid for each piece of equipment exceed the rates established by the <br />Equipment Rental Agreement even if the actual cost for such equipment is higher. The <br />Owner may audit the Contractor's cost records to determine actual equipment cost. The <br />following information shall be provided for each piece of equipment: <br />i. Detailed description (e.g., Motor Grader Diesel Powered Caterpillar 12 "G", Tractor <br />Crawler ROPS & Dozer Included Diesel) <br />ii. The hours of use or standby; and <br />iii. The specific day and dates of use or standby; <br />iv. Job Overhead. <br />v. Overhead (general and administrative). <br />vi. Subcontractor's contract claims (in the same level of detail as specified herein is <br />required for all Subcontractor's contract claims); and <br />vii. Other categories as specified by the Contractor or the Owner. <br />10. A notarized statement shall be submitted to the Owner's Representative containing the following <br />language: <br />Under the penalty of law for perjury or falsification, the undersigned, <br />of <br />(name) (title) <br />(company) <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.