My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
The Contractor shall be entitled to an extension of Contract Time for Delays to the extent caused <br />by a Third Party or Force Majeure Event. Extension of Contract Time shall be determined <br />pursuant to 5.2.2.2 Extensions of Contract Time. <br />12.4.3.5 Extended or Unabsorbed Overhead <br />12.4.3.5.1 General <br />To present a request for additional compensation for Extended or Unabsorbed Overhead, the <br />Contractor has the burden of keeping and maintaining accurate documentation to support any such <br />claim. If the Contractor fails to provide or keep adequate financial data for an accurate and fair <br />Eichleay calculation, Contractor waives and releases any claim for Unabsorbed or Extended <br />Overhead. In presenting any claim under this section of the Contract, the Contractor agrees to provide <br />to the Owner any and all financial data needed by the Owner, or its representative, to review, <br />substantiate and evaluate any claim for Extended and/or Unabsorbed Home Office Overhead. Failure <br />to provide the requested information shall constitute waiver by the Contractor. <br />If Contractor is entitled to an adjustment of Contract Sum for Unabsorbed or Extended Overhead, it <br />shall be calculated as provided in 9.5.3. Unabsorbed and Extended Overhead. <br />12.4.3.5.2 Elements <br />Contractor shall only be entitled to an adjustment of Contract Sum for Unabsorbed or Extended <br />Overhead if it clearly and convincingly demonstrates all of the following: <br />1 The Owner solely caused a delay to the Completion Date as measured by analysis of the project <br />duration by the critical path method pursuant to 5.2.2.2 Extensions of Contract Time; <br />2. Because of such Delay, the Contractor was forced to suspend or significantly interrupt its <br />performance so that it was on standby or idled, and the Owner required the Contractor to be ready <br />to resume performance on short notice. Extended time of performance of Work, such as <br />extensions caused by changes, inefficiencies, or Extra Work, does not constitute suspension or <br />significant interruption of performance. <br />3. The Contractor could not and did not use resources, including but not limited to labor, materials <br />and equipment, standing by or idled on this or any other project for any work during the period of <br />delay; <br />4. The Contractor's Overhead costs did not materially vary from its usual seasonal Overhead costs <br />during the period of delay; and <br />5. The Delay did not cause Overabsorbed Overhead in the period in which the delayed Work was <br />completed. <br />12.4.3.5.2.1 Resources <br />To demonstrate the Contractor could not and did not use resources, including but not limited to <br />labor, materials and equipment from this Project for any other work on this or any other project <br />during the period of delay (12.4.3.5.2.(3)), the Contractor must: <br />a. Affirmatively represent and warrant that it did not perform substitute Work; <br />b. Identify the specific resources that were idled; and <br />c. Show that those resources did not, and could not, work on other contracts or projects during <br />the Delay. <br />12.4.3.5.2.2 No Material Variations <br />To demonstrate the Contractor's Overhead costs did not materially vary from its usual seasonal <br />Overhead costs during the period of delay (12.4.3.5.2.(4)), the Contractor must; <br />a. Affirmatively represent and warrant that the completion of the subject Work was extended <br />and that such extension prevented the performance of other work during both the period of <br />delay and the later period of time required to complete the extended Work, <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.