Laserfiche WebLink
51. If Contractor is qualified as a self -insurer in accordance with RCW 51.14, Contractor shall so certify <br />by letter signed by a corporate officer indicating that it is a qualified self insured, and setting forth the <br />limits of any policy of excess insurance covering its employees. <br />15.3.15 Self -Insurance <br />At its sole option and in its sole discretion, Owner may accept Contractor's self-insurance for a liability <br />coverage in lieu of insurance from an insurer. Contractor must provide a letter from its Corporate Risk <br />Manager, or appropriate Finance Officer representing and warranting the following minimum <br />information: whether the self-insurance program is actuarially funded; the fund limits; any excess <br />declaration pages to meet the Contract requirements; a description of how Contractor would protect and <br />defend the Owner as an Additional Insured in their Self -Insured layer; and claims -handling directions in <br />the event of a claim. Any amounts due to, sought by, or paid to third party claimants shall be the sole <br />responsibility of the Contractor, irrespective of whether such amount falls wholly within the level or <br />amount of the Contractor's self -insured retention. <br />16. LAWS, REGULATIONS AND PERMITS <br />16.1 GENERAL <br />The Contractor shall give the Notices required by law and comply with all laws, ordinances, rules and <br />regulations pertaining to the conduct of the Work. The Contractor shall indemnify, defend, and save <br />harmless the City (including its agents, officers, and employees) against any claims that may arise <br />because the Contractor (or any employee of the Contractor or Subcontractor or material person) violated a <br />legal requirement. The Contractor shall be liable for violations of same in connection with Work <br />provided by the Contractor; and Contractor shall cooperate with all governmental entities regarding <br />inspection of the Work and compliance with such requirements. If the Contractor observes that the <br />Drawings, Specifications or other portions of the Contract Documents are at variance with any laws, <br />ordinances, rules or regulations, he or she shall promptly notify the Owner's Representative in writing of <br />such variance. The Owner will promptly review the matter and, if necessary, take appropriate action. <br />Contractor agrees not to perform Work it knows, or in the exercise of ordinary care should know, to be <br />contrary to any laws, ordinances, rules or regulations. <br />16.2 PERMITS AND LICENSES <br />Unless otherwise specified, permits and licenses from governmental agencies, which are necessary only <br />for and during the prosecution of the Work and the subsequent guarantee period, shall be secured by the <br />Contractor and paid for by the Owner. Permits and licenses of regulatory agencies that are necessary to <br />be maintained after expiration of the guarantee period will be secured and paid for by the Owner. <br />The City of Everett Utilities Depatlinent has reviewed and commented on the Drawings in this Contract. <br />If an erosion control plan is required, the Contractor shall submit an erosion control plan that depicts the <br />best management practices that will be followed for erosion control. The Contractor may use the plans in <br />this Contract. The fee for this permit will be waived by the City of Everett. <br />Electrical permits can be obtained at: <br />City of Everett <br />3200 Cedar Street — 2nd Floor <br />Everett, WA 98201 <br />Phone: 425/257-8800 <br />16.3 PATENTS AND ROYALTIES <br />Costs involved in fees, royalties, or claims for any patented invention, article, process or method that may <br />be used upon or in a manner connected with the Work under this Contract or with use of completed Work <br />by the Owner shall be paid by the Contractor. The Contractor and its sureties shall protect and hold the <br />Owner, Owner's Representative, and Owner's Representative, together with its officers, agents, and <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />