IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SECTION 01 10 00 <br />SUMMARY OF WORK <br />PART1 GENERAL <br />1.01 SUMMARY <br />A. This Section describes a project to construct one 8 million gallon reinforced and partially buried <br />concrete reservoir, shoring systems, electrical and instrumentation and control systems, and <br />associated piping and other appurtenances, including steel piping, trench and reservoir <br />excavation, haul, backfill, and spoils disposal. The 8-MG reservoir is Phase 1 of the overall <br />project and this reservoir is called Reservoir 3A. The work also includes two off site pipe <br />connections near Reservoir 2. An area on the site has been designated as Zone A and <br />excavated material from this zone may contain PFAS. Spoils from Zone A shall be stockpiled <br />onsite and left for reuse onsite in Phase 2 of this project. Phase 2 is not part of this contract.. <br />1.02 LOCATION <br />A. The Project is located in Everett, Washington, and Reservoir 3A is located on City of Everett <br />property at 6107 Evergreen Way, Everett, WA 98203. The site also contains three existing <br />pump stations, a cellular tower, and the existing 20-MG covered reservoir which must remain in <br />service during Phase 1 work. <br />B. The Project also includes two pipe connections and cut/caps east of Reservoir 2 at the <br />intersection of Tulalip and Charles Avenue and the intersection of Federal and Edward Avenue. <br />C. Dredged Sand soils for the backfill on the Reservoir 3A site shall be City -owned soils currently <br />at the City owned property located along the west bank of the Snohomish River near the <br />intersection of 1-5 and US 2. Site is gated - arrange for gate access. <br />1.03 COORDINATION OF DRAWINGS AND SPECIFICATIONS <br />A. The above limited description of work does not in any way limit the responsibility of the <br />Contractor to perform all work and furnish all equipment, labor and materials required by the <br />Contract Documents. <br />B. No attempt has been made in these Contract Documents to segregate work covered by any <br />trade or subcontract under a single specification. Such segregation and establishment of <br />subcontract limits will be solely a matter of agreement between the Contractor and its <br />subcontractors. <br />C. The Contract Documents are intended to describe and provide for a complete project. Any <br />requirement in one is as binding as if stated in all. The Contractor shall provide all work and <br />materials clearly implied in the Contract Documents even if the Contract Documents do not <br />mention it specifically. If there is a conflict within the Contract Documents it will be resolved by <br />the following order of precedence, per Section 00 72 00 subsection 1.2 1-12. <br />D. Dimensions shown on the Drawings or that can be computed from the Drawings shall take <br />precedence over scaled dimensions. Notes on Drawings shall take precedence over Drawing <br />details. <br />E. The intent of the Drawings and specifications is to prescribe the construction and completion of <br />the work which the Contractor will perform according to the terms of the Contract. Where the <br />Drawings or specifications describe portions of the work in general terms, but details are <br />incomplete or silent, it is understood that the Contractor shall use only the best general <br />practices. Unless otherwise specified, the Contractor shall furnish all labor, materials, tools, <br />Reservoir 3 Replacement Phase 1 SUMMARY OF WORK March 2024 <br />Work Order No. UP3739 01 10 00 <br />