My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
equipment, and incidentals, and do all the work involved in executing the Contract in a manner <br />satisfactory to the Engineer. <br />1.04 WORK UNDER OTHER CITY CONTRACTS OR BY CITY STAFF <br />A. No concurrent City projects are known in the immediate vicinity of this project at the time of the <br />bid. <br />B. The site also contains three pump stations, the existing 20-MG covered reservoir and a cellular <br />tower, which are constantly in use. <br />1.05 SPECIFICATION LANGUAGE <br />A. Specifications are written mostly in imperative and streamlined form. Unless indicated <br />otherwise, this imperative language is directed to the Contractor. Additionally, the words "shall <br />be" shall be included by inference where a colon (:) is used within sentences or phrases. <br />1. Examples: <br />a. Aggregate: ASTM C33. <br />b. Adhesive: spread with notched trowel. <br />B. Individual specification sections may include a reference to other sections. Specification <br />sections referenced are intended only to assist in identifying associated work and are not <br />intended and shall not be considered to be all inclusive. The Contractor is responsible for <br />performing all the work in the Contract Documents whether referenced in the specific <br />specifications or not. <br />C. Whenever there is wording stating that an item is "as specified", "as shown", or "as indicated", <br />the reference is to all the Contract Documents. Stating "as specified", "as shown", or "as <br />indicated" does not refer necessarily to a Drawing or specification, but it may refer to either. <br />D. Furnish, Install, Perform, Provide: <br />1. The word "furnish," when used in connection with services, materials, or equipment, shall <br />mean to supply and deliver said services, materials, or equipment to the site (or some other <br />specified location) ready for use or installation and in usable or operable condition. <br />2. The word "install," when used in connection with services, materials, or equipment, shall <br />mean to put into use or place in final position said services, materials, or equipment <br />complete and ready for intended use. <br />3. The words "perform" or "provide," when used in connection with services, materials, or <br />equipment, shall mean to furnish and install said services, materials, or equipment <br />complete and ready for intended use. <br />4. If the Contract Documents establish an obligation of Contractor with respect to specific <br />services, materials, or equipment, but do not expressly use any of the four words "furnish," <br />"install," "perform," or "provide," then Contractor shall furnish and install said services, <br />materials, or equipment complete and ready for intended use. <br />E. Unless otherwise indicated, all materials and equipment incorporated into the Work shall be as <br />specified and shall be new and free of defects. <br />F. Requirements for UL or FM label shall mean UL or FM label or other OSHA/Nationally <br />Recognized Testing Lab (NRTL) agency when approved by the City. <br />1.06 REFERENCES <br />A. Whenever a specification in this Contract references the specifications of WSDOT or similar <br />jurisdiction, it is to define the technical standards to be met for this Contract and only the <br />technical standards are referenced. Administrative provisions such as measurement and <br />payment of the referenced specification shall not apply to this Contract in any instance. <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 01 10 00 <br />SUMMARY OF WORK March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.