Laserfiche WebLink
B. References to industry, association and governing codes and standards are to be interpreted <br />as reference to the version current at the date of submission of the Contract bids. <br />END OF SECTION <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 01 10 00 <br />SUMMARY OF WORK March 2024 <br />