IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SECTION 01 12 16 <br />WORK SEQUENCE <br />PART1 GENERAL <br />1.01 SUMMARY <br />A. This Section includes basic sequencing, phasing, constraints, and coordination requirements <br />for the Phase 1 work Reservoir 3A. Phase 2's Reservoir 3B is not part of this contract. <br />1.02 SUBMITTALS <br />A. Procedures: Section 01 33 00. <br />B. Work Sequencing Plan: At a minimum, this plan shall include the following: <br />1. Complete sequence of construction as necessary to complete the work within the Contract <br />Time. Coordinate Work Sequencing Plan with the Schedule of Values and Construction <br />Progress Schedule. <br />2. Include major work activities, milestones, and constraints. Include start dates for <br />subcontractors starting their work. <br />3. Include the submittals process, ordering, and delivery of long lead time materials to verify <br />the work can be completed within the Contract Time. <br />4. Listing of major pieces of equipment to be present on site during each phase of the work. <br />5. Address assistance required of the Owner's operating personnel during any work activities. <br />6. Provide contingency plans identifying any action that will be taken if activities during a <br />shutdown cannot be completed within the allotted time. <br />1.03 CONSTRUCTION COMPLETION AND GENERAL SEQUENCING OF WORK <br />A. In order to maintain a reliable water supply to the greatest extent possible, certain elements of <br />work must be completed in the following sequence: <br />1. The new Reservoir 3A, connecting pipes, equipment, metering systems, chlorination <br />monitoring systems, electrical, and instrumentation systems shall be accepted as <br />Substantially Complete prior to making final connections to the existing water system. The <br />new Reservoir 3A shall be capable of providing all of the necessary storage functions for <br />this site assuming the existing 20-MG reservoir will be taken off line at the end of Phase 1. <br />Existing Reservoir 3, the cell tower, and the three existing pump stations served by the <br />existing reservoir shall remain in service throughout the duration of Phase 1 except where <br />explicitly stated in this specification. <br />2. Phase 2 is not part of this project. <br />B. Protection of existing facilities and utilities. <br />C. TESC facility installation. <br />D. Site security fence (temporary and permanent) installation prior to the demolition of the existing <br />fence. Site shall be secure at all times. Provide keys to Engineer. <br />E. Excavation and shoring system design and installation. <br />F. Reservoir and associated piping system construction including disinfection and testing. <br />G. Completion of electrical systems, instrumentation, controls systems, and related systems. <br />H. Backfill and shoring system removal or partial removal. <br />I. Site restoration and landscaping. <br />Reservoir 3 Replacement Phase 1 WORK SEQUENCE March 2024 <br />Work Order No. UP3739 01 12 16 <br />