IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
J. Removal of all or part of TESC facilities. <br />1.04 INTERRUPTION OF UTILITY SERVICE <br />A. Work Sequencing Plan shall indicate required shutdowns of existing utilities or interruptions of <br />existing operations. Update on Progress Schedules. <br />B. Submit requests for interruptions to City of Everett Utility Service Department not less than five <br />business days in advance of the date scheduled for the interruption unless a more stringent <br />requirement is stated in this specification. Provide copy of requests to Engineer. <br />C. Submit requests for interruptions to Alderwood Water and Wastewater District not less than 25 <br />business days in advance of the date scheduled for the interruption. Provide copy of requests <br />to Engineer. <br />D. Following receipt of the request, Engineer will notify Contractor if the requested date will be <br />allowed or not. Evaluation of the request will be based upon the availability of the utility owner's <br />personnel to assist and monitor utilities during the shutdown period and impact to customer <br />service. <br />E. Minimize the period of interruption by thorough advance planning. Procure and provide all <br />required materials, equipment, and labor on site during the shutdown. <br />F. Do not begin interruption until written authorization is received from Engineer. <br />1.05 CONSTRAINTS <br />A. Charles and Tulalip Cut/Cap: The City needs to drain part of the system piping before this <br />cut/caps can occur. Provide a minimum of 30 days notice to the Engineer to schedule this work. <br />The disconnections shall be performed and completed over a two week period during the <br />Jackson Elementary School Winter Break (typically starting on the Monday before December <br />25th). Contact Everett Public School District for exact dates. <br />B. Lauren Valve and Federal Avenue Connections: The City needs to drain part of the system <br />piping before these connections can occur. Provide a minimum of 30 days notice to the <br />Engineer to schedule this work. The tie-ins shall be performed and completed over a two week <br />period during the Jackson Elementary School Winter Break (typically starting on the Monday <br />before December 25th). Contact Everett Public School District for exact dates. <br />C. AWWD Pipe Support: The Alderwood Water and Wastewater District (AWWD) needs to drain <br />part of the system piping before this pipe support work can occur. It is not acceptable to <br />excavate beneath this pipe when the pipe is in operation. Provide a minimum of 30 days notice <br />to the Engineer to schedule this work. The pipe support work itself shall occur outside the <br />window from May 1st to September 30th. Lastly, this work cannot occur if the forecasted outside <br />temperature may reach 90 degrees Fahrenheit or above. This pipe can remain offline for a <br />duration of 1 month when drained and supported. <br />1. Provide load dispersing measures such as tree protection matting/crane matting over <br />top of the existing AWWD PCCP pipes where construction traffic will cross. <br />2. Do not stockpile materials or park equipment on top of the existing AWWD PCCP. <br />D. Yard Piping: <br />1. For all areas outside of the Zone A excavation area, the City needs to drain parts of the <br />system piping before connections to existing pipes can be made. Provide a minimum of 30 <br />days notice to the Engineer to schedule this work. This piping work must occur outside the <br />window from May 1st and September 30th. Connections to existing pipes must take less <br />than 48 hours, defined by the time the pipe is taken out of service, to being placed back <br />into service following satisfactory testing and disinfection. Lastly, this work cannot occur if <br />the forecasted outside temperature may reach 90 degrees Fahrenheit or above. <br />Reservoir 3 Replacement Phase 1 WORK SEQUENCE March 2024 <br />Work Order No. UP3739 01 12 16 <br />